论文部分内容阅读
对下煤层开采后的冒落带高度进行了分析计算,确定局部上行开采可行,并进行矿压观测,试验获得成功。
The height of the caving zone after the coal seam mining is analyzed and calculated, the local ascending mining is confirmed and the rock pressure observation is conducted, and the experiment is successful.