The International Conference of Power and Energy,Chinaunder the sponsorship of Chinese Society of ElectricalEngineering,and co-sponsorship of the Chinese Societ
1. Introduction CPECC, the China Power Engineering Consulting Corpora-tion, a legal economic entity and an associate member of the ChinaInternational Engineerin
(1) The revising of criteria of power system planning and operation are absolutely needed to adapt ever-changing conditions and to make the better coordination
The paper presents a renovation of thermal system design of a power and heat cogeneration device by utilizing the "Process Energy Integration Method". The new a
The Ertan Hydroelectric Project is located about 40 km northfrom Dukou City in Sichuan Province,on the lower reach ofYalong River,which is one of the tributarie
1.IntroductionWith the increasing of turbo-generator (TG) capacity,the limi-tation on the abnormal frequency operation is growing more restric-tive.In order to