论文部分内容阅读
目前,丹江口市已建成沼气池3万余口。为了确保沼气池的正常使用和发挥最大效益,该市积极创新机制,已筹建好市级能源服务中心的办公场所,并按照“三级”服务网络要求,逐步建立以市级服务中心为依托、镇中心站为支撑、村服务网点为基础、技术服务人员为骨干的农村能源管理服务体系。严格按照“建、管、用”并重的工作方针,重点建设一批,故障维修一批,努力提高“一池三改”沼气池的普及率、完好率、使用率,以解除沼气用户的后顾之忧,实现农村沼气事业的“朝朝日上”。
At present, Danjiangkou has built more than 30,000 digesters. In order to ensure the normal use of biogas digesters and to maximize their benefits, the city has been actively innovating and has set up the office space for municipal-level energy service centers. In accordance with the “Three-level” service network requirements, the city has gradually established a municipal service center of Relying on the town center for the support of the station, the village service network as the basis for technical services as the backbone of the rural energy management service system. In strict accordance with the “construction, management, with” the principle of equal emphasis on the construction of a number of batch repair a group of failures, and strive to improve “a pool of three changes,” digester penetration, intact rate, utilization to lift Biogas users worry about the future, to achieve the cause of rural biogas “Asahi Asahi ”.