论文部分内容阅读
本文对某铁路客运专线制梁场C50高性能砼泵送施工堵管的原因进行了分析,并探讨了应对措施,以抛砖引玉,引起共鸣。
In this paper, the cause of blockage of C50 high-performance concrete pumping construction in the construction of a special passenger railway line of a railway passenger line was analyzed and the countermeasures were discussed to attract people’s attention and resonate.