论文部分内容阅读
海潮坝面板堆石坝在施工中调地制宜采用堆石料洞室爆破,级配符合设计要求。滑模用手动葫芦牵引,面板平整。对已成面板进行详细的检查,面板无贯穿性裂缝。工程进度快,质量优良。
In the construction, the tidal flat dam rockfill dam should adopt the blasting of rockfill materials and adjust the grading to meet the design requirements. Slide with manual hoist traction, panel formation. Has been a detailed examination of the panel, the panel has no through cracks. Project progress fast, good quality.