文章介绍京哈线四平编组站上行驼峰场自动化改造工程施工中,调坡方案的设计,提出按线束封锁施工中,线路(含道岔)调坡的方法,为类似工程确定施工方案提供了参考资料。
This article introduces the design of the slope adjustment plan in the construction of the automated hump peak automation in the Siping planing station in Jingha Line and proposes the method of slope adjustment in the blockade construction of the line harness (including turnout), which provides a reference for the similar construction project .