为满足双曲线冷却塔施工人员的需要,电力建设总局组织编写了《双曲线冷却塔施工手册》。目前手册初稿已完成,电力建设总局于1981年11月23日到30日组织了十四个设计、施工单位及电力出版社等二十五名代表进行了审查。《双曲线冷却塔施工手册》是根据1980年全国冷却塔、烟囱施工技术交流会的决定进行编写的,由山东电建一处和西北电建四公司负
In order to meet the needs of hyperbolic cooling tower construction workers, the General Administration of Electric Power organized and compiled the “Hybrid Cooling Tower Construction Manual.” At present, the first draft of the manual has been completed. From November 23 to November 30, 1981, the General Administration of Electric Power Construction organized a total of 25 representatives from 14 design and construction units and the Electric Power Press to conduct the review. The “Hybrid Cooling Tower Construction Manual” was prepared according to the 1980 national cooling tower and chimney construction technology exchange meeting. It was built by Shandong Power Construction and Northwest Power Construction IV.