Characterization of transient groundwater flow through a high arch dam foundation during reservoir i

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:forever_2010
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Even though a large number of large-scale arch dams with height larger than 200 m have been built in the world, the transient groundwater flow behaviors and the seepage control effects in the dam foundations under difficult geological conditions are rarely reported. This paper presents a case study on the transient groundwater flow behaviors in the rock foundation of Jinping I double-curvature arch dam, the world’s highest dam of this type to date that has been completed. Taking into account the geological settings at the site, an inverse modeling technique utilizing the time series measurements of both hydraulic head and discharge was adopted to back-calculate the permeability of the foundation rocks,which effectively improves the uniqueness and reliability of the inverse modeling results. The transient seepage flow in the dam foundation during the reservoir impounding was then modeled with a parabolic variational inequality(PVI) method. The distribution of pore water pressure, the amount of leakage, and the performance of the seepage control system in the dam foundation during the entire impounding process were finally illustrated with the numerical results. Even though a large number of large-scale arch dams with height larger than 200 m have been built in the world, the transient groundwater flow behaviors and the seepage control effects in the dam foundations under difficult geological conditions are rarely reported. This paper presents a case study on the transient groundwater flow behaviors in the rock foundation of Jinping I double-curvature arch dam, the world’s highest dam of this type to date that has been completed. Taking into account the geological settings at the site, an inverse modeling technique utilizing the time series measurements of both hydraulic head and discharge was adopted to back-calculate the permeability of the foundation rocks, which effectively improves the uniqueness and reliability of the inverse modeling results. The transient seepage flow in the dam foundation during the reservoir impounding was then modeled with a parabolic variational inequality (PVI) method. The distribution of pore water pressure, the am ount of leakage, and the performance of the seepage control system in the dam foundation during the entire impounding process were finally illustrated with the numerical results.
其他文献
近年来,随着广大电力客户对供电可靠性要求进一步提高,以及城市配电网网络结构的进一步完善,在故障、检修停电情况下,为了尽可能缩小停电范围,实现供用双赢,通过环网操作转移负荷是
现今国家经济的快速发展,使得教育工作的开展受到了一定的影响.在政工思政教育工作中,教学方式的创新问题得到了人们的广泛关注,对其科学的创新化策略进行分析研究,极为重要.
本文主要结合河南省襄城县气象局地面测报工作的实际,对襄城县地面测报工作存在的问题进行分析,并给出了相应的应对措施,以供同行参考借鉴.
期刊
期刊
伴随我国社会主义现代化进程的不断加快,以及经济的不断发展,各行各业的发展势头都十分迅猛,新时期下,建筑行业也如日中天,显现出大好的发展势头。作为实施建筑工程的最基本保障,安
期刊
针对现代教育技术与应用课程试卷判卷工作过于繁重的现状,提出了无纸化考试模型,给出了模型工作流程和自动判卷模块详细设计图,并成功组织了课程无纸化考试,实现了自动判卷,
期刊
高校辅导员是开展大学生心理健康教育的主导力量,他们的心理状态对学校教育管理工作的有效开展十分重要.当前,一些辅导员由于面对繁重的工作任务,产生了一定的心理障碍,处于