本文针对水利水电建设项目水资源论证工作中出现的主要技术问题,对水资源论证范围的选取和工作等级确定,取用水的合理性分析,取水水源论证,取退水对周边环境的影响分析等关键技术作了重点阐述。对目前新疆巴音郭楞蒙古自治州水利水电项目水资源论证工作中存在的主要问题进行分析,并提出了解决问题的建议,为做好新疆巴州水利水电建设项目水资源论证工作理清了思路,明确了工作重点难点。
In this paper, water conservancy and hydropower construction project water resources demonstration work in the main technical problems that arise, the selection of water resources demonstration scope and work level to determine the rational use of water analysis, water source argument, take back water on the surrounding environment impact analysis The key technologies are elaborated. This paper analyzes the main problems in the demonstration of water resources of the Bayinguoleng Mongolia Autonomous Prefecture Water Resources and Hydropower Project and puts forward the suggestions to solve the problems. It clarifies the thinking of doing a good job in the demonstration of water resources of the Bazhou water conservancy and hydropower construction project in Xinjiang , A clear focus of the work difficult.