论文部分内容阅读
结合国家标准《先张法预应力混凝土管桩》的制定,阐述了先张法预应力混凝土管桩结构的设计、计算方法及其它要素,并以实例进一步说明了设计方法的应用。
Combining with the formulation of the national standard “prestressed prestressed concrete pipe pile”, the design, calculation method and other elements of the pretensioned prestressed concrete pipe pile structure are described. The application of the design method is further illustrated by examples.