论文部分内容阅读
广西钦州港一期工程产权转让项目 钦州港一期工程建设规模为2个万吨级泊位,装卸功能以装卸散杂货为主。前沿水深9.4米,码头岸线长365米,陆域纵深650米,占地162.5亩,设计年吞吐能力90万吨,可同时停靠两艘万吨级船舶作业。现有仓库0.5万平方米,堆场8万平方米,以及相配套的办公和生产设施,10吨门座式起重机4台,16吨门座式起重机1台及相配套的后场作业机械,2600马力港作拖轮1艘,以及GPS卫星导航系统。 该项目1994年建成投入运营以来,吞吐量增长迅速,其中2000年完
Qinzhou Port Phase I Project of Transferring Property Rights Qinzhou Port Phase I project has a construction scale of 2 10,000-ton berths. Loading and unloading functions are mainly loaded and unloaded groceries. The frontier is 9.4 meters deep, the wharf is 365 meters long and the land area is 650 meters deep. It covers an area of 162.5 mu and has a design annual handling capacity of 900,000 tons. It can dock two 10,000-ton ships at the same time. The existing warehouse of 5 million square meters, yard 80,000 square meters, and supporting the office and production facilities, 10 tons of four portal cranes, 16 tons of portal cranes and a matching backyard operations Machinery, 2600 horsepower harbor for a tugboat, and GPS satellite navigation system. Since the project was put into operation in 1994, its throughput has been growing rapidly, of which 2000 has been completed