锡铁山铅锌矿副井提升系统改造

来源 :矿业研究与开发 | 被引量 : 0次 | 上传用户:bafjeght
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
为了缓解锡铁山铅锌矿斜坡道的运输压力,矿方决定改造现有副井提升系统,使其提升能力达到600~800kt/a。根据副井运行现状,分析提出了3种技术可行的改造方案,通过技术经济优缺点综合比较,确定轻型罐笼配3m3非标侧卸式矿车为最佳改造方案,为矿山实施副井提升系统改造提供了技术指导。 In order to relieve the pressure on the ramp of the Xieshan Lead-Zinc Mine, the mine decided to upgrade the existing auxiliary shaft hoisting system so that its lifting capacity could reach 600 ~ 800kt / a. According to the status quo of auxiliary shaft operation, three kinds of feasible technological transformation schemes are analyzed and analyzed. Through comprehensive comparison of advantages and disadvantages of technical economy, it is determined that light cage with 3m3 non-standard side-mounted dump truck is the best modification scheme and the auxiliary shaft hoisting system Retrofitting provides technical guidance.