【摘 要】
:
在其他作者提出的计算极限井网密度单井极限控制储量方法的基础上,提出了一种计算极限井网密度的新方法(修正的单井极限控制储量法)。新方法不但考虑了开发总投资及其利息,而且考
【机 构】
:
江汉石油学院石油工程系,辽河石油勘探局研究院
论文部分内容阅读
在其他作者提出的计算极限井网密度单井极限控制储量方法的基础上,提出了一种计算极限井网密度的新方法(修正的单井极限控制储量法)。新方法不但考虑了开发总投资及其利息,而且考虑了主开发期内逐年原油销售收入及其利息、逐年操作费用及其利息。实例计算结果和与其他方法对比结果表明,新方法是合理的。
Based on the calculation method of single well limit control reserves of ultimate well density proposed by other authors, a new method to calculate ultimate well density (modified single well limit control reserve method) is proposed. The new method takes into account not only the total investment for development and its interest, but also the annual sales revenue of crude oil and its interest, year-on-year operating costs and interest thereon in the main development period. The results of example calculation and comparison with other methods show that the new method is reasonable.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
本文应用k—ε—■湍流模型,较详尽地推导和建立了在静止环境中的湍浮力射流的数学模型。
In this paper, the k-ε- ■ turbulence model is used to derive and establish
几十年来,国外在许多河流上修建了一些中低水头水电站。水头70米以下、装机容量在200万千瓦以上的大型中低水头水电站的技术指标见附表。这些水电站一般位于河流比降平缓、
日前,印尼政府为保护其本国厂商,在不违反WTO(世界贸易组织)的规定下,采取了若干措施限制国外产品进口。 这些措施的主要内容是对工业产品要求环保标准,对农产品要求
Recen
根据中孟科技合作议定书的协议,珠江水利委员会考察团一行三人,于1983年9月7日至9月22日考察了孟加拉国恒河三角洲治理开发工程。
According to the protocol of the proto
前言本文根据马氏决策理论,给出了跨流域补偿调节的最优决策模型和求解方法。可得到最优的调水策略。一、系统的描述(一)系统的物理意义系统包括两个流域,甲河流上游有调节
随着孔子学院在全球的设立,汉语在世界范围内以前所未有的速度传播,孔子学院的快速发展一方面极大地加快了汉语在世界传播的速度,扩大了汉语的影响,另一方面也给汉语的海外传
本文从孔隙结构、物性、砂体展布等方面详细论证了文 2 5东块沙二下油藏宏观和微观非均质特征 ,建立了不同沉积微相的非均质模式 ,并结合油田开发特征 ,分析了各种非均质模式
水轮机汽蚀破坏是许多电站普遍存在的问题,根据实践认为,水轮机汽蚀破坏的程度和水轮机的类型、叶型、制造质量、材质、运行工况以及装置汽蚀系数等因素有关。对装置汽蚀系
自90年代初起,进口汽车在国内日益增多,且势头不减。其配件供应、车辆维修在行业中的产值已占半壁江山。然而由于广大用户及配件供应商、维修厂对进口汽车的底盘号(俗称17位