我国大型水利水电工程地质勘察工作的主要经验(续二)——第二部分 若干单项工程的主要经验小结

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:zwsbjh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
紫坪铺水电站原设计坝型为混凝土重力坝,水头67米(相应坝高为93米)。坝址位于龙门山地槽东南边缘山前凹陷带,出露岩层主要为下侏罗纪煤系砂页岩互层,属于复理式沉积,岩性很不稳定,褶皱很剧烈,形成许多由东北至西南方向延伸、并向东南倒转的短轴背斜和向斜(?)。坝址区岩层的基本走向为北30度~75度东,倾向北 Zipingpu hydropower station originally designed for the concrete gravity dam dam, head 67 meters (the corresponding height of 93 meters). The dam site is located in the piedmont sag zone at the southeast margin of the Longmenshan gnarder. The exposed rock strata are mainly interbedded with the lower Jurassic coal measures of sand shale, belonging to complex-type sediments. The lithology is unstable and the folds are very violent, resulting in many formations from northeast to southwest Direction and extended to the southeast of the minor axis anticline and syncline (?). The basic trend of the dam formation in the dam site is north 30 degrees to 75 degrees east, with a tendency of north
其他文献
新安江水电站工程的水力枢紐怖置形式,在初步设計阶段中,选定了厂房頂溢流的重力坝坝后厂房式。当时未曾对厂房与坝体的接头方式問題进行深入研究。本工程为一級建筑物,且在
▲世界最长的岩石隧洞是芬兰赫尔辛基附近的Pijnne隧洞,全长120公里,断面面积15.5米~2,1981年建成。▲世界最大断面的隧洞是瑞典 ▲ The longest rocky tunnel in the worl
一、地表径流的利用 1.利用地表径流的必要性和可能性一、水文气象方面在天然情况下,供水量与农作物的需水量往往不相适应,这是灌溉设计中必须解决的一个课题。解决这个课题
Hierarchical porous patterns have been fabricated on the C face,Si face,and cross section of n-type 6H—SiC crystal via photo-electrochemical etching using HF/C
一、三门峡水库的规划方针问题 1.存在的矛盾三门峡水库要满足防洪、灌溉、发电和改善航运的要求。这对于国民经济的发展是必要的,尤其防洪更是下游两岸几千万人民的迫切要
本文要考察的是以关贸总协定(GATT)为中心的多边贸易体系的前景,它所面临的危险及其依然奉行的承诺。关贸总协定目前面临的威胁来自各种原因,包括世界经济的变化。这些变化
Ⅰ、悬移质输沙率的测验方法在水文规范中规定为三种,即:积点法、流速比混合法及定比混合法。积点法是比较精确的方法,但在抢测洪峯、沙峯时往往因取样太多且测次加密而产生
折叠式自行车风挡本实用新型涉及折叠式自行车风挡,本风挡由风挡玻璃、支撑臂、带车把固定件的支撑座或带插入支撑座、及车梁固定件组成。风挡玻璃装在支撑臂上端,支撑臂下
本文通过对食品生物行业、企业的调研,研制了食品生物工艺专业教学指导方案,改革了食品生物工艺专业的人才培养方案和课程体系,并对教学模式、评价模式、师资队伍、实训环境
没有什么比突然失明更令人痛苦的了。混有甲醇的酒精饮料是发展中国家的灾难,会导致失明,甚至死亡。这些危险饮品来自条件恶劣的烧酒作坊,犯罪者为了谋取暴利加入甲醇降低酒