论文部分内容阅读
在毛主席“备战、备荒、为人民”的伟大战略方针指引下,我厂积极响应上级党委关于“大搞地方办电”的指示,将上级交给我厂制造6500瓩水轮机原设计中的全部铸、锻钢件都改用稀土镁球铸件,它占整机总重的76.86%。第一台水轮机安装在广东佛山地区河排水电站,于1972年9月26日试机运转,至今仍继续发电使用。6500瓩水轮机以球铁代钢的零件见表19。
Under the guidance of Chairman Mao’s great strategic guideline of “preparing for war, preparing for war and for the people,” our factory responded positively to the instructions of the party committees at higher levels on “making local authorities do a great deal of power” and handed over the superior to all of the original design of the 6500 hydro turbine Casting, forgings are made of rare earth magnesium ball casting, which accounted for 76.86% of the total weight of the machine. The first turbine was installed in the river drainage station in Foshan, Guangdong Province. It was commissioned on September 26, 1972 and still continues to generate electricity. 6500 瓩 turbine to ductile iron steel parts in Table 19.