上海市第二建筑工程公司203工程队广大职工,在兄弟单位的大力支持下,在承建上海解放以来最高的提兰桥21层旅馆工程施工中,积极推广新工艺、新结构、新材料和新设备,做到了速度快,质量较好,并确保了安全生产。主体工程总高度垂直偏差控制在10毫米以内,混凝土强度合格,并为平面及结构布置较为复杂的高层建筑采用大模板施工新工艺积累了经验。
The employees of the No. 203 Engineering Team of Shanghai No. 2 Construction Engineering Co., Ltd., with the strong support of their fraternal units, actively promoted new processes, structures, materials, and new products during the construction of the 21-story hotel project at the highest levee bridge in the city since the liberation of Shanghai. The equipment has achieved high speed, good quality, and ensured safe production. The vertical deviation of the total height of the main works is controlled within 10mm, the concrete strength is qualified, and the experience of using large formwork construction new technology for high-rise buildings with complex plane and structure layout is accumulated.