清江隔河岩水利枢纽导流隧洞出口段为全风化页岩,洞底下为石牌页岩,且系风化层移裂隙发育,是整个隧洞开通困难最大的障碍地段,通过设计、施工人员共同努力与安全监测,工期历时11个月,于1997年12月15日完工过水,创造国内当年开工当年过水的新纪录。
The outlet of the diversion tunnel at the Geheyan Water Conservancy Project in Qingjiang River is fully weathered shale. The bottom of the tunnel is the Shi Shale, and the fissure of the weathering layer is developed. It is the most difficult obstacle for the entire tunnel opening. Through design and construction personnel work together With safety monitoring, the construction period lasted 11 months and completed the watering on December 15, 1997 to create a new record of the domestic water flow that year when it started construction.