近年来,随着国际工程承包市场的发展,工程项目日趋大型化、复杂化、多元化,总承包模式得到了较大的发展空间。由于在资源配置、综合效益、实务性等方面的优势,EPC(Engineering Procurement Construction)合同模式越来越受到业主和承包商的推荐。所谓EPC,是指工程项目中的设计(Engineering)、采办(Procurement)和施工(Construction)的交钥匙工程,需要注意的是Engineering所表示的设计是指加工制造方面对设备、装置以及系统等方面机理与流程方面的设计。作为一种交钥匙工程,EPC尤其适用于专业性强、技术含量高、结构和工艺较为复杂并包括大量非标设备的工业项目。在EPC模式下,由一个总承包商或者承包商联营体与
In recent years, with the development of the international engineering contracting market, engineering projects have been increasingly large-scale, complicated and diversified, and the general contracting model has gained a lot of room for development. Due to the advantages of resource allocation, comprehensive benefits and practicality, EPC (Engineering Procurement Construction) contract mode is more and more recommended by owners and contractors. The so-called EPC, refers to the project engineering, procurement (Procurement) and construction (Construction) of the turnkey project, it is important to note that the Engineering said the design refers to the processing and manufacturing aspects of equipment, devices and systems Mechanism and process design. As a turnkey project, EPC is particularly well suited for industrial projects that are highly specialized, technically advanced, complex in structure and technology, and include a large number of non-standard equipment. In the EPC mode, a general contractor or contractor associates with a contractor