论文部分内容阅读
文章介绍了洪河渠道倒虹吸出口闸在高温季节施工所采取的各种温控措施,总结了内部冷却水管设置的施工经验,为其他工程大体积混凝土施工提供参考。
This paper introduces various temperature control measures adopted in the construction of Honghe canal inverted siphon outlet in high temperature season, summarizes the construction experience of the internal cooling water pipe setting, and provides references for mass concrete construction in other projects.