湖南岳阳宾馆总高36m,共11层。由于建筑场地8~11m 深便到达风化岩层,故设计采用持力桩支承上部重量。根据现场条件,采用了人工开挖灌注桩,较好地完成了基础工程施工。一、工程概况本工程采用框架剪力墙结构,支承在钢筋混凝土灌注桩上,桩的网距为7.6×7.6m,桩直径φ800~φ1000,桩高8~11 m,桩贯穿了耕上层、回填土层、粘土层和高岭土层,直至风化岩顶面,并入岩层300mm。 Hunan Yueyang Hotel has a total height of 36 meters and a total of 11 floors. As the construction site is 8 to 11m deep, it will reach the weathered rock formation. Therefore, the design uses a support pile to support the upper weight. According to the site conditions, artificial excavation piles were used to complete the basic construction. I. Project Overview This project adopts a frame shear wall structure and is supported on a reinforced concrete cast-in-place pile with a pitch of 7.6 × 7.6m, a pile diameter of φ800 ~ φ1000, and a pile height of 8 ~ 11m. The pile penetrates the upper cultivating layer, Backfill the clay layer, clay layer and kaolin layer until the top of the weathered rock and merge it into the rock layer 300mm.
其他文献
该机采用了先进的传动技术和成熟的机械传动装置。设计先进、结构合理、符合国情,具有工作可靠、性能优良、操作方便、维修简单的特点。经性能测试和400多小时的工业考核,证
2中国标准化50年成绩斐然2.4采用国际标准和国外先进标准取得长足进步为了参加国际经济大循环,以便适应经济向全球一体化发展的新形势,我国已经把积极采用国际标准和国外先进标
胜利石油管理局于1994年开始探索实施全员劳动合同化管理,1996年1月正式全面推行劳动合同制。胜利油田作为国有特大型企业,用工制度改革之前,在长期发展过程中逐步形成了比
邓小平同志早就指出 :“任何事情都是人干的 ,没有大批的人才 ,我们的事业就不能成功。”民族地区的战略地位十分重要 ,没有民族地区的经济繁荣和社会进步 ,就没有整个国家的
中国建筑材料工业协会平板玻璃协会和全国建筑材料工业玻璃专业情报信息网于1987年11月23日至26日在秦皇岛市召开了全国玻璃工业新技术推广应用交流会。参加会议的代表分别
目前,北京可利用为避难场所用地的总规模为5300多公顷,其中城八区内共有公园140余处,市、区级大型体育场13处,学校操场面积500多公顷。今年,市政管委和北京市地震局将在城八
文题展示:大小(举例:大城市小人物、大时代小英雄)命题分析看到这个半命题作文题,你想到了什么?那“大”后和“小”后横线留下的空白,是不是一块有待耕种的土地?你是这块土地
春融期间,北方地区道路翻浆是交通运输中遇到的一大公害。为治理道路翻浆,国家每年耗费大量的人力和物力。目前常用的措施有:提高路基、做好路基排水、铺设隔水层、设路基盲
具有木地板的质感,触觉舒适,美观雅致,耐磨耐蚀,施工简便和易于清洗的耐磨复合地板,最近在亚运会工程指挥部和林业部外宾接待室等工程上试用,反应良好。耐磨复合地板在《北
这个项目的独特之处在于它非同寻常的建造过程。BE是在工程已经被授权于瑞士建筑工作室之后才受到邀请参与到规划中来的。然而当时整个工程的建造方案早已定型。因此,根据原