摘要:在建筑施工中,绝大部分的水暖安装都是在土建工程的主体结构完成、内墙体与外墙体砌筑结束之后才进行后续工作的。怎么样把水暖安装工程中的质量通病减少,进行行之有效的预防,把水暖安装工程同土建工程相关工作配合好,是提高建筑工程整体施工质量的重要一环。本文对于水暖安装工程中常出现的问题进行分析总结,并提出了几点关于预防措施的建议。
关键词:水暖安装工程;质量通病;水暖工程改进
Abstract: in the building construction, the vast majority of plumbing installation is in the main body of the civil engineering structure complete, inside wall body and the building wall after a follow-up to the work. How to plumbing installation project of the quality problems reduce, perform effective prevention, the plumbing installation project with civil engineering related work well with, is to improve the quality of the whole construction engineering construction is important one annulus. This paper for plumbing installation project often appears the problems are analyzed and summarized, and puts forward some Suggestions concerning the prevention measures.
Key words: plumbing installation project; The common faults; Plumbing engineering improvement
中图分类号:O213.1文献标识码:A 文章编号:
在水暖安装工程中,常会出现诸如洞口、管道、套管等预埋位置不准,排水管道壅堵等问题。究其原因,盖出于水暖工程同相关土建工程的配合协调工作没有做好之故。虽则水暖安装工程的主体属于后续工作,但有一部分基础性工作则是与土建工作同步进行的。比如孔洞预留、标高设置、管道预埋、成品保护等等。怎么样预防水暖安装工程的质量通病,是把建筑工程总体施工质量提高上去的关键性问题。
一、水暖安装工程质量通病预防措施的关键
(一)在思想上给以高度的重视,在建筑的设计、施工以及监理等多方面工作中,要制定出有效、切实的管理措施。做好施工前期预备工作,不但把水暖工程的图纸审明白,同时也要进行相关土建工程图纸的关联审核、统一对比。对于出现的问题冲突,要进行研究协调,做出明确的交待反馈,争取在施工之前,就把问题解决掉。
(二)建立起完善的管理制度和管理体系。以项目部的安排为基础,成立一支水暖安装工程预埋预留小组,负责全面的土建和安装工程相关工作。小组人员由项目部内的管理安装工程的负责人主抓,其成员构成为:技术负责人、安装工程师、各施工长、施工队技术人员等。
(三)施工过程,一定要严格按照操作规范、操作流程、施工工艺以及技术交底规定进行。适当采用创新工艺,使质量得到提高。
(四)完善成品保护的方法措施,以防止人为原因造成的质量通病。
二、管道、洞口和套管等的预埋、预留位置与标高问题
(一)通病表现
通常表现在应当预留预埋的标高、位置不准,或者是根本忘记预留。水暖安装工程预埋预留是建筑中的重要有机组成环节。它的施工质量的好坏会直接对建筑工程整体质量水平产生影响。完整、有序、及时地把质量管理工作做好,是建设优秀工程的有力保障。在施工工作中,经常会出现浇筑混凝土工作时,没有人员进行相应管理,导致把预留洞口遗忘,水暖安装时,使用大锤现砸孔,使得大片的钢筋暴露出来、产生钢筋变形,更为严重的是为了砸孔而把钢筋割断,对工程的质量安全产生恶劣影响。
(二)原因探讨
此为水暖安装和土建工程相配合的重要环节。预埋预留位置不准确,没有预留。使得在管道安装期间任意凿剔,对结构钢筋与混凝土产生破坏,影响到工程结构安全与工程质量。具体原因分析如下:
1、项目部的领导对于水暖土建关联工作重视程度不够,投入的资金少、人员少,使正常的施工与管理受到影响。
2、技术交底不清楚或者是操作人员的专业技术水平不够,导致对于施工预留位置弄不明白。
3、水暖安装和土建施工没有进行相应沟通联系,使得土建图纸同专业图纸存在分歧,对具体位置、预留标高等项上的差别没有及时发现,各自施工,形成返工,致使经济与质量受双重影响。
(三)预防措施
1、专业技术人员一定要把具体操作规程对具体操作人员交代清楚,施工技术的交底工作是把施工前期质量控制工作做好的前提条件。施工交底编排工作施工班组同项目部要进行不同的角度编排,班组的技术交底工作要根据项目部的交底工作进行细化编排。
2、在施工实施之前,项目部应把土建、电气、水暖、空调、通风、消防等各种图纸进行对比研究,若发现有位置标高上的差异时,应联系设计单位进行确认,若问题确实存在,由设计单位进行设计变更,再根据变更后的设计图纸实施施工。
3、为了施工上的方便,水暖图纸可以交给土建专业保管,或者在施工之前,根据图纸把相应的具体位置、数量、规格、标高制成简图提供给土建专业。
4、模板施工之后,由水暖安装专业人员进行验收。在管道的安装过程中,不允许使用大锤砸孔,若进行取孔工作,应由水钻或者冲击钻完成。
三、室内安装工程排水管道发生阻塞的问题
(一)通病表现。
室内排水管道壅堵是比较常见的建筑安装工程通病,也是土建施工和管道安装配合过程中比较难以克服的问题。在土建和水暖安装的交叉施工过程中,造成管道壅堵的事例比较多。特别明显的是地漏以及卫生间的排水口。即便在管道安装已经做完,管口业已被水泥砂浆封闭时,又往往遭人为打开,进行水磨石地面的清洗、水泥地面找平排污等施工工作。导致通畅的管道被破坏掉。
(二)原因探讨。
有的施工人员在屋面的透气管口和雨水斗掉落碎石、木条、砂浆、垃圾等,造成管道的壅堵,轻者要耗工费时进行疏通,重的则要重新凿打混凝土地面,拆除管道二次安装。耗费人工、耗费物料、影响工期。而有的排水管道管腔里边发生部分堵塞,前期没有留意,在通水和试水的过程当中,也没有及时发现,当投入正式使用之后,出现管道的堵塞是必然的,肯定影响到用户正常使用。
(三)预防措施。
为避免联合施工过程中出现的管道壅堵现象,管道安装之前,除了要认真疏通管腔、排除杂物、合理规范地使用排水配件之外,在进行管道安装工作时,要保证坡度,使管道设计符合要求规范的规定;另外,排水管口在使用水泥砂浆封口的正常措施之外,还要采取下列的多种技术举措,以预防管道壅堵:
1、因為建筑结构的需要,立管上有时会安设乙字管,在设置乙字管时,要根据要求,在乙字管上部加设检查口,以方便检修。
2、如果设计上没有具体要求时,要按照施工和验收的规定,在有连接三个以上的卫生器具污水横管时,应当安装有清扫口;要在转角低于135度的污水横管之上,加装清扫口或者是检查口。
3、安装排水管道时,立管和埋地排出管暂时不相互接连。立管检查口的管插处,以托板支撑牢固,及时补好立管穿过二层的板洞,确认立管可靠固定之后,对临时支撑物实行拆除。这个管口要避免作为土建施工的污水排出口。在土建结束后,对底层和二层管道进行灌水实验,然后再用直通套筒把检查口管同底层的排出管相接连。
4、在排水管道的施工当中,水平支管放水过程时如发现水流速度放慢,则说明水平支管段内部有堵塞现象,要查明水平支管堵塞位置,把垃圾与杂物清除干净。
5、为确保屋面管口和楼面地漏不受石子、垃圾和黄砂掉落到排水管中。所有的地漏、透气管与雨水管口要及时以水泥砂浆进行封闭。这后,要定期对封闭管口进行检查,确认没有被土建工人打开,若发现打开及再次堵塞,要及时采取措施补救。
6、卫生器材就位时,须先把排水管口临时封闭设施拆除掉,再检查管内是否有任何杂物,把管口清洁干净。若有条件时,可以用自来水冲洗每一个排水管口,一直到水流畅通,冲洗完毕。在认真检查后,确认卫生器材排水管孔确实没有壅堵现象发生,才进行卫生器材就位安装。
总结:
经过实践,惟有严格遵循现有的工艺标准与施工规范、提升施工者技术素质、对施工中每一具体环节都进行严格质量把关,才可以把水暖安装工程中可能出现的质量通病避免掉。做好了以上几点,工程的质量是完全能得到保障的。
参考文献:
[1] 依英伟,宋明;新型建筑给水管材的建筑与施工[J];《今日科苑》;2007(12)
[2] 崔江玲;水暖工程中常见问题简述[J];《山西建筑》;2008(4)
[3]张志平;水暖工程中常见的问题及解决措施[J.];《中小企业管理与科技》;2009
[4] 史新华.建筑水暖及空调工程施工质量控制[J].《建筑工程参考》;2007(05)
[5] 张闻民,王绍民.暖卫与通风工程施工技术[J].《民用工程科技研究》;2007(03)
注:文章内所有公式及图表请以PDF形式查看。
关键词:水暖安装工程;质量通病;水暖工程改进
Abstract: in the building construction, the vast majority of plumbing installation is in the main body of the civil engineering structure complete, inside wall body and the building wall after a follow-up to the work. How to plumbing installation project of the quality problems reduce, perform effective prevention, the plumbing installation project with civil engineering related work well with, is to improve the quality of the whole construction engineering construction is important one annulus. This paper for plumbing installation project often appears the problems are analyzed and summarized, and puts forward some Suggestions concerning the prevention measures.
Key words: plumbing installation project; The common faults; Plumbing engineering improvement
中图分类号:O213.1文献标识码:A 文章编号:
在水暖安装工程中,常会出现诸如洞口、管道、套管等预埋位置不准,排水管道壅堵等问题。究其原因,盖出于水暖工程同相关土建工程的配合协调工作没有做好之故。虽则水暖安装工程的主体属于后续工作,但有一部分基础性工作则是与土建工作同步进行的。比如孔洞预留、标高设置、管道预埋、成品保护等等。怎么样预防水暖安装工程的质量通病,是把建筑工程总体施工质量提高上去的关键性问题。
一、水暖安装工程质量通病预防措施的关键
(一)在思想上给以高度的重视,在建筑的设计、施工以及监理等多方面工作中,要制定出有效、切实的管理措施。做好施工前期预备工作,不但把水暖工程的图纸审明白,同时也要进行相关土建工程图纸的关联审核、统一对比。对于出现的问题冲突,要进行研究协调,做出明确的交待反馈,争取在施工之前,就把问题解决掉。
(二)建立起完善的管理制度和管理体系。以项目部的安排为基础,成立一支水暖安装工程预埋预留小组,负责全面的土建和安装工程相关工作。小组人员由项目部内的管理安装工程的负责人主抓,其成员构成为:技术负责人、安装工程师、各施工长、施工队技术人员等。
(三)施工过程,一定要严格按照操作规范、操作流程、施工工艺以及技术交底规定进行。适当采用创新工艺,使质量得到提高。
(四)完善成品保护的方法措施,以防止人为原因造成的质量通病。
二、管道、洞口和套管等的预埋、预留位置与标高问题
(一)通病表现
通常表现在应当预留预埋的标高、位置不准,或者是根本忘记预留。水暖安装工程预埋预留是建筑中的重要有机组成环节。它的施工质量的好坏会直接对建筑工程整体质量水平产生影响。完整、有序、及时地把质量管理工作做好,是建设优秀工程的有力保障。在施工工作中,经常会出现浇筑混凝土工作时,没有人员进行相应管理,导致把预留洞口遗忘,水暖安装时,使用大锤现砸孔,使得大片的钢筋暴露出来、产生钢筋变形,更为严重的是为了砸孔而把钢筋割断,对工程的质量安全产生恶劣影响。
(二)原因探讨
此为水暖安装和土建工程相配合的重要环节。预埋预留位置不准确,没有预留。使得在管道安装期间任意凿剔,对结构钢筋与混凝土产生破坏,影响到工程结构安全与工程质量。具体原因分析如下:
1、项目部的领导对于水暖土建关联工作重视程度不够,投入的资金少、人员少,使正常的施工与管理受到影响。
2、技术交底不清楚或者是操作人员的专业技术水平不够,导致对于施工预留位置弄不明白。
3、水暖安装和土建施工没有进行相应沟通联系,使得土建图纸同专业图纸存在分歧,对具体位置、预留标高等项上的差别没有及时发现,各自施工,形成返工,致使经济与质量受双重影响。
(三)预防措施
1、专业技术人员一定要把具体操作规程对具体操作人员交代清楚,施工技术的交底工作是把施工前期质量控制工作做好的前提条件。施工交底编排工作施工班组同项目部要进行不同的角度编排,班组的技术交底工作要根据项目部的交底工作进行细化编排。
2、在施工实施之前,项目部应把土建、电气、水暖、空调、通风、消防等各种图纸进行对比研究,若发现有位置标高上的差异时,应联系设计单位进行确认,若问题确实存在,由设计单位进行设计变更,再根据变更后的设计图纸实施施工。
3、为了施工上的方便,水暖图纸可以交给土建专业保管,或者在施工之前,根据图纸把相应的具体位置、数量、规格、标高制成简图提供给土建专业。
4、模板施工之后,由水暖安装专业人员进行验收。在管道的安装过程中,不允许使用大锤砸孔,若进行取孔工作,应由水钻或者冲击钻完成。
三、室内安装工程排水管道发生阻塞的问题
(一)通病表现。
室内排水管道壅堵是比较常见的建筑安装工程通病,也是土建施工和管道安装配合过程中比较难以克服的问题。在土建和水暖安装的交叉施工过程中,造成管道壅堵的事例比较多。特别明显的是地漏以及卫生间的排水口。即便在管道安装已经做完,管口业已被水泥砂浆封闭时,又往往遭人为打开,进行水磨石地面的清洗、水泥地面找平排污等施工工作。导致通畅的管道被破坏掉。
(二)原因探讨。
有的施工人员在屋面的透气管口和雨水斗掉落碎石、木条、砂浆、垃圾等,造成管道的壅堵,轻者要耗工费时进行疏通,重的则要重新凿打混凝土地面,拆除管道二次安装。耗费人工、耗费物料、影响工期。而有的排水管道管腔里边发生部分堵塞,前期没有留意,在通水和试水的过程当中,也没有及时发现,当投入正式使用之后,出现管道的堵塞是必然的,肯定影响到用户正常使用。
(三)预防措施。
为避免联合施工过程中出现的管道壅堵现象,管道安装之前,除了要认真疏通管腔、排除杂物、合理规范地使用排水配件之外,在进行管道安装工作时,要保证坡度,使管道设计符合要求规范的规定;另外,排水管口在使用水泥砂浆封口的正常措施之外,还要采取下列的多种技术举措,以预防管道壅堵:
1、因為建筑结构的需要,立管上有时会安设乙字管,在设置乙字管时,要根据要求,在乙字管上部加设检查口,以方便检修。
2、如果设计上没有具体要求时,要按照施工和验收的规定,在有连接三个以上的卫生器具污水横管时,应当安装有清扫口;要在转角低于135度的污水横管之上,加装清扫口或者是检查口。
3、安装排水管道时,立管和埋地排出管暂时不相互接连。立管检查口的管插处,以托板支撑牢固,及时补好立管穿过二层的板洞,确认立管可靠固定之后,对临时支撑物实行拆除。这个管口要避免作为土建施工的污水排出口。在土建结束后,对底层和二层管道进行灌水实验,然后再用直通套筒把检查口管同底层的排出管相接连。
4、在排水管道的施工当中,水平支管放水过程时如发现水流速度放慢,则说明水平支管段内部有堵塞现象,要查明水平支管堵塞位置,把垃圾与杂物清除干净。
5、为确保屋面管口和楼面地漏不受石子、垃圾和黄砂掉落到排水管中。所有的地漏、透气管与雨水管口要及时以水泥砂浆进行封闭。这后,要定期对封闭管口进行检查,确认没有被土建工人打开,若发现打开及再次堵塞,要及时采取措施补救。
6、卫生器材就位时,须先把排水管口临时封闭设施拆除掉,再检查管内是否有任何杂物,把管口清洁干净。若有条件时,可以用自来水冲洗每一个排水管口,一直到水流畅通,冲洗完毕。在认真检查后,确认卫生器材排水管孔确实没有壅堵现象发生,才进行卫生器材就位安装。
总结:
经过实践,惟有严格遵循现有的工艺标准与施工规范、提升施工者技术素质、对施工中每一具体环节都进行严格质量把关,才可以把水暖安装工程中可能出现的质量通病避免掉。做好了以上几点,工程的质量是完全能得到保障的。
参考文献:
[1] 依英伟,宋明;新型建筑给水管材的建筑与施工[J];《今日科苑》;2007(12)
[2] 崔江玲;水暖工程中常见问题简述[J];《山西建筑》;2008(4)
[3]张志平;水暖工程中常见的问题及解决措施[J.];《中小企业管理与科技》;2009
[4] 史新华.建筑水暖及空调工程施工质量控制[J].《建筑工程参考》;2007(05)
[5] 张闻民,王绍民.暖卫与通风工程施工技术[J].《民用工程科技研究》;2007(03)
注:文章内所有公式及图表请以PDF形式查看。