论文部分内容阅读
为解决甘肃省中部地区干旱缺水问题,甘肃省实施了引洮供水二期工程。在工程的规划实施过程中,充分贯彻落实流域调水工程的“三先三后”原则,即先节水后调水;先治污后通水;先区域生态环境保护后用水。同时,针对存在的问题,采取措施,进一步挖掘区域节水、治污、环保潜力。相关措施实施后,将减少污染源并促进水资源保护和管理,保证水资源可持续利用,造福当地群众。
In order to solve the problem of drought and water shortage in the central part of Gansu Province, Gansu Province implemented the second phase of water supply project. During the planning and implementation of the project, the principle of “Three First, Three afterwards” should be fully implemented in the planning of the river basin water diversion project. That is, the water should be transferred after water saving; the water should be treated first and then the water used; the water should be used after the ecological environment protection in the first area. At the same time, in response to the existing problems, measures should be taken to further tap the potential for water saving, pollution control and environmental protection in the region. After the relevant measures are implemented, sources of pollution will be reduced and the protection and management of water resources will be promoted so as to ensure the sustainable utilization of water resources and benefit the local people.