论文部分内容阅读
介绍连南良坪水电站初设阶段大坝设计方案中混凝土面板堆石坝和薄拱坝两种坝型并进行比较,叙述在满足地形、地质条件情况下,优先选择混凝土面板堆石坝的主要原因是混凝土面板堆石坝比较经济。
This paper introduces two types of concrete face rockfill dam and thin arch dam in the initial stage of dam design of Nanliangping Hydropower Station, and compares them with those of thin arch dam. In the condition of satisfying the topography and geological conditions, the main choice of concrete face rockfill dam The reason is that concrete faced rockfill dam is more economical.