去年4月,我公司接受了国家建委建研院关于“升板与提模相结合施工方法的研究”科研协调任务,在建设单位和南京市勘测设计院的配合下,并选择南京市交电公司仓库工程进行试点。升板提模法施工试验,是在总结以升板带滑模和大块模板的基础上进行的,它保留了以升带滑施工中升板、墙体、外装饰工程同时施工的特点,吸取了大
In April of last year, our company accepted the scientific research coordination task of “Research on the construction method of combination of lifting plate and lifting mold” by the State Construction and Construction Commission Research Institute. In cooperation with the construction unit and the Nanjing Survey and Design Institute, we chose Nanjing Jiaozuo The company warehouse project is piloted. The lift plate lift method construction test is carried out on the basis of summarizing the riser with sliding form and large formwork. It retains the characteristics of simultaneous construction of riser, wall and exterior decoration works in the ascending and sliding construction. Draw a large