论文部分内容阅读
在铁料院专家的帮助指导及上海局工务处、南昌分局工务分处重视参与下,94年9月~12月对皖赣线202号南河#1桥采用“ZV型混凝土修补胶”成功地进行粱体修补,该桥病害及施工情况如下:一、情况简解及病害发展过程该桥里程K404+871,全长191.00米,5孔31.7米预应力水泥T梁,
With the guidance and guidance of experts from Iron Cofferdams and the Shanghai Municipal Bureau of Public Works and the branch office of Nanchang Branch attached great importance to the project, “ZV Concrete Repair Glue” was successfully applied to No. 2 Nanhe # 1 Bridge of Anhui-Jiangxi Line from September to December in 1994 The beam disease repair and construction are as follows: First, the situation is simple and disease development process The bridge mileage K404 +871, a total length of 191.00 meters, 5 holes 31.7 meters of prestressed cement T beam,