论文部分内容阅读
薛店水电站系羣众自办,位于薛店的西门外,利用汝河和赵寨的泉水以及地面的落差建站发电,实际利用落差为四公尺,设计引用流量为0.4公方/秒,水轮机室设计水深为1.0公尺,进口宽0.5公尺,并选用1号木轴木制旋桨式水轮机一台,其动轮直径为0.4公尺。今为了充分贯彻“多、快、好、省,因地制宜,就地取材”的建站原则,以降低建站之投资,同时根据苏联及其他地区的先进经验,并结合本地的具体情况,在该站重点试用了砖砌圬工尾水管。其尾水管之长度 L 为:
Xuedian Hydropower Station is run by the masses. It is located outside the west gate of Xuedian. Utilizing the spring water of Ruhe and Zhaozhai and the drop station on the ground to generate electricity, the actual utilization gap is four meters. The designed reference flow rate is 0.4 km / Design depth of 1.0 meters, 0.5 meters wide entrance, and the choice of a wooden shaft 1 wooden propeller-type turbine, the wheel diameter of 0.4 meters. In order to fully implement the principle of “building more, faster, better, cheaper, better suited to local conditions”, the principle of establishing a station is to reduce the investment in establishing a station. At the same time, according to the advanced experience of the Soviet Union and other regions, combined with the local specific conditions, Tried brickworks tail pipe. The length of the draft tube L is: