本文根据长办多年对三峡工程从事的科研、设计工作,论证了枢纽工程采用“一次建成,分期蓄水”兴建方式的可能性,阐述了各分部建筑物及水力发电设备,为实施这一兴建方式在技术上所采取的技术措施。
Based on the research and design work carried out by CTO for the Three Gorges Project for many years, this paper proves the possibility of adopting the construction method of “once completed and staged storage” in the hub project, and elaborates on various branch buildings and hydropower equipment. In order to implement this Construction methods in the technical measures taken.