我公司隶属于中材集团的全资子公司,2010年9月,在吴忠市太阳山开发区建成投产的一条φ4.0×60m的新型干法回转窑生产线,日产2500t油井水泥熟料。2010年11月—2011年2月生产初期,因矿山石灰石岩层分布不均匀,表面黄土覆盖层较多,开采时出现大面积的高氧化镁岩层,含量高达10.0%以上,由于未能对质量进行有效、合理的搭配,对熟料煅烧和熟料质量影响较大。公司结合实际情况,通过不断的创新与探索,优化操作中的参数和配料方案,取得了较好的效果。
Our company belongs to a wholly-owned subsidiary of Sinoma Group. In September 2010, a new dry-process rotary kiln production line of φ4.0 × 60m was put into operation at Sun Mountain Development Zone, Wuzhong City, and a daily output of 2500t oil well cement clinker was manufactured. From November 2010 to February 2011, due to the uneven distribution of limestone rock in the mine, there are many loess layers on the surface, and a large area of high magnesia rock layer appears in the mining area with a content of more than 10.0% due to the failure of the quality Effective and reasonable collocation, clinker calcination and clinker quality greater impact. Companies with the actual situation, through continuous innovation and exploration, optimizing the operation of the parameters and ingredients program, and achieved good results.