论文部分内容阅读
《调洪演算全图解法》一文(见参考文献),主要是解决已知出库流量过程线q~t反求入库流量过程线Q~t,以及已知入库流量过程线Q~t及最大泄量q_m反求预留防洪库容V_防(以此确定汛前限制水位)等问题。但在水库运行过程中,管理人员经常要遇到一些比较复杂的调洪演算课题,而且要求迅速得出结
The “flood mapping calculation diagram” article (see references), mainly to solve the known outbound flow process line q ~ t reverse flow into the library Q ~ t, and the known flow of Q ~ t And the maximum discharge q_m reverse reserve flood control capacity V_ (in order to determine the flood control before the water level) and other issues. However, during the operation of reservoirs, managers often encounter some more complicated flood control calculation tasks, and require quick conclusion