墙、柱面大理石干法施工与传统的湿法施工相比,墙、柱面大理石干法施工的区别在于取消了砂浆或细石混凝土灌浆工序,而采用板材上下行间用钢销连接,板材与结构体间用钢丝挂钩锚拉、石膏固定的方法(图1),省去湿法施工中的各种卡箍夹具,也避免了因灌浆而导致的板材错...
Compared with conventional wet construction, the difference between wall and column marble dry construction and the marble dry construction differs from the elimination of mortar or fine stone concrete grouting process. The method of fixing with steel wire anchors and plasters between structures (Fig. 1) eliminates the clamp fixtures used in wet construction and also avoids slag-induced plate faults.