论文部分内容阅读
会议于元月19—22日召开。会上总结了59年专署水文地质工作,交流了经验,学习了有关的工作方法,安排了60年的工作计划。会议确定60年专署水文地质工作方针任务(摘要)是:为保证各级矿产储量及矿山开采对水文地质资料的要求,必须加强矿区水文地质工作,在矿产勘探的同时进行相应的水文地质工作,并对生产矿山进行矿井水文地质调查工作;对缺水地区进行供水水文地质勘测,以满足城市、工业用水需要;根据有关厂矿、企业的要求,适当进行厂基、桥梁等工程地质勘测;根据
The meeting was held on January 19-22 January. The meeting summed up 59 years of agency hydrogeology work, exchange of experience, learn about the working methods, arranged for 60 years of work plan. Meeting to determine 60 years agency’s hydrogeological guidelines (summary) is: In order to ensure that all levels of mineral reserves and mining of hydrogeological data requirements, we must strengthen the hydrogeological work in the mining area, mineral exploration at the same time the corresponding hydrogeological work, And conducted mine hydrogeological survey of production mines; carried out water supply hydrogeological survey on water-shortage areas to meet the needs of urban and industrial water use; properly conducted geological survey of plant bases and bridges according to the requirements of factories and mines and enterprises;