论文部分内容阅读
随着我国社会和经济的不断发展,各种工程建设事业也得到了进一步的发展,很多先进的施工技术在工程施工中得到了广泛的应用。在深水防波堤工程建设中,抛石断面施工技术就是一项有效的施工技术。在社会科学技术不断发展的今天,该技术也变得越来越完善,有效提高了深水防波堤工程的石料抛填施工质量。而想要有效控制抛填质量以及断面成型,就必须选择合适的施工工艺。以华能唐山港曹妃甸港区煤码头造陆工程护岸及临时围埝C标段为例,对深水防波堤工程中的抛石断面成型有效控制手段进行了分析。
With the continuous development of our society and economy, various construction projects have been further developed. Many advanced construction technologies have been widely applied in construction. In deepwater breakwater construction, riprap section construction technology is an effective construction technology. With the continuous development of social science and technology, the technology has also become more and more perfect, effectively improving the quality of stone throwing and filling construction in deepwater breakwater projects. And want to effectively control the quality of throwing and cross-section molding, we must choose the appropriate construction technology. Taking Huaneng Tangshan Port Caofeidian port coal terminal land reclamation project and temporary Cloak section C as an example, the deepwater breakwater project in the pluton section forming effective control measures were analyzed.