对调整励磁机电刷中性线方法的改进

来源 :水力发电 | 被引量 : 0次 | 上传用户:jingqihao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在小水电站过去普遍用电压感应法来确定励磁机电刷的中性线位置,这在理论上是正确的。但用这种方法确定励磁机电刷的中性线位置是在机组静态情况下进行的,当励磁机运行时,其气隙中的磁力线也会沿旋转方向移动一定的位置。因此,会使静态情况下确定的电刷中性线位置产生一定的误差,特别是对高转速的机组这种误差更大。为了克服上述方法的不足,笔者在实践中采用了另一种确定电刷中性线位置 In the past, it was theoretically correct to determine the neutral position of the exciter brush by voltage induction in small hydropower plants. However, in this method, the neutral position of the exciter brush is determined under static conditions of the generator unit. When the exciter is in operation, the magnetic flux in the air gap also moves a certain distance along the rotation direction. Therefore, it will make the determination of the static position of the brush neutral position have some error, especially for high speed unit error greater. In order to overcome the above shortcomings, I used in practice to determine another brush neutral position
其他文献
原著虽是早年资料,但文中介绍的与鲁布革水电站今年11月截流情况相类似,特此摘译刊载。纳伦河托克托古里水电站坝址处,平均年径流量为116.5亿米~3。河水流量120~2500米~3/秒
ABC管理法是从ABC曲线分析转化而来的一种管理方法,又称重点管理、分类管理法。它是根据事物有关方面的特征,进行统计、排列,划分为A、B、C三类,以便分清重点与一 ABC mana
我省合阳县孟庄乡吴庄沟的斜拉渡槽经过一年的施工、于一九八五年十二月九日胜利建成,经西安公路科研所调索测试一次成功,完全达到设计标准。这座渡槽系钢筋混凝土结构,由摩
广告意在向公众传播信息,但如果乱贴而影响市容,在厦门就要受到暂停使用电话的处理。近年来,乱贴广告已成为 Advertising is intended to disseminate information to the
随着我国社会文明的快速发展,教育事业的进步是有目共瞩的。高职院校的教学水平,对于高职学生未来的个人发展有着重要的影响。高职院校美术专业,是培养一线美术技术人员的重
前些时候社会上有人说“三峡工程的基础准备不足”,是“仓促决定的”。这些议论被海外报纸广为传播。记者在采访调查的第一站重庆,与重庆水文总站的技术人员(大都是中年人)
当沃尔—马特公司的一种电线商品快要售完时,这家美国零售商巨人,就立即利用EDI(电子数据交换)系统,送出一份订单给乔治亚州的一家公司,这份订单在该公司的EDI系统中,立刻受
语言能够代表一个国家的整体形象,也是影响世界的一种方式。因此在世界范围内扩展本国语言乃塑造国家影响力的重要途径之一。随着“韩流”在世界范围内不断升温,加之韩国政府
河池绝大部份地区位于云贵高原前缘的斜坡地带上,水力资源藏量十分丰富。据统计,仅小水电蕴截量为87万千瓦,可供开发的55万千瓦(不包括红水河)。目前已开发的15.15万千瓦,占
报道了一个内腔式连续波、单谐振1.9μm和2.4μm双波长激光输出的光参量振荡器(OPO)。实验采用单管半导体激光二极管(LD)抽运掺钕钒酸钇(Nd…YVO4)晶体,腔内抽运掺氧化镁的周