论文部分内容阅读
500 kV濉溪变电站是安徽淮北地区第1所500 kV综合自动化变电站,隶属于华东网调直接调度管理,网调对事故及异常处理的正确性和快速性有了更高的标准,要求事故处理的时间大幅缩短(事故发生后5 min内汇报故障基本情况)。为了适应大电网快速发展及对变电站故障处理的要求,保证变电运行事故处理的正确性和快速性,从专业技术角度和运行管理上对自动化变电站事故异常处理流程进行优化,达到快速处理事故的目的。
500 kV Taixi Substation is the first 500 kV integrated substation in Huaibei, Anhui Province. It belongs to the direct dispatch and management of East China network. The network adjusts the correctness and rapidity of accidents and abnormalities with higher standards, Significantly reduce the time (within 5 min after the accident to report the basic situation of failure). In order to meet the rapid development of large power grid and transformer substation fault handling requirements to ensure the correctness and rapidity of substation operation, from the technical point of view of professional and operational management of automated substation accident anomalies to optimize the process to achieve rapid processing of accidents purpose.