枕头坝一级水电站2008年开始筹建、2012年项目核准、2015年3月完成移民验收和蓄水验收,计划2015年5月完成水库下闸蓄水,2015年7月首台机组投产发电。国电大渡河枕头坝水电建设有限公司对枕头坝一级水电站建设环境进行优化管理,枢纽工程未发生停阻工事件,满足合同工期要求,送出工程涉及一区一县较合同工期提前三分之一,移民安置任务较下闸蓄水提前近1年完成。特别是库区淹没影响的省道S306复建项目,成为当前水电建设项目中第一个在蓄水阶段移民验收前完成了整体验收移交地方政府的项目。
Pillow dam a hydropower station construction began in 2008, 2012 project approval, completed in March 2015 immigrants acceptance and storage acceptance, plans to be completed in May 2015 under the gate storage, in July 2015 the first unit commissioned power generation. State Power Dadu River Pillow Dam Hydropower Construction Co., Ltd. to optimize the construction of the pillow dam level hydropower construction environment, stop the hub project does not occur to meet the requirements of the contract duration, sending a project involving a district one county earlier than the contract period , Resettlement task than the next flood gate nearly 1 year to complete. In particular, the reconstruction project of Provincial Highway S306 affected by the inundation of the reservoir area has become the first project in the hydropower construction project that has completed the overall acceptance and transfer of the local government before the acceptance of the resettled water in the storage period.