论文部分内容阅读
工程建设的质量控制关系到工程建设的全过程,重点在于做好事前控制。应对设计图纸进行事前控制,消除图纸的质量隐患;监理单位应认真编制监理规划、实施细则,发挥监理方的主观能动性,增强责任感;核查承包单位的质量保证体系,从承包单位的体制上进行控制;审查分包单位资质及人员配备,从队伍建设上进行质量事前控制;对工程所需的原材料、中间产品和永久性设备等从采购、加工制造、运输装卸、存放、检验、使用等方面进行系统地全过程地监督与控制,使工程建设顺利达到质量目标。
Quality control of construction projects related to the entire process of construction, the focus is on pre-emptive control. The design drawings shall be controlled in advance to eliminate the hidden dangers of the quality of the drawings. The supervisory unit shall carefully formulate supervision plans and implementation rules, give play to the subjective initiative of supervisors and enhance the sense of responsibility, verify the quality assurance system of the contractor, and control the system from the contractor ; Review subcontractor qualification and staffing, carry out quality control in advance from team building; Carry out procurement, processing, transportation, loading, unloading, storage, inspection and use of raw materials, intermediate products and permanent equipment needed for the project Systematically monitor and control the entire process, so that the construction of the project successfully achieve quality objectives.