为了发展港口事业,近几年来,乐清湾港区围海造地工程蓬勃开展,到目前为止,乐清湾港区已经完成乐清湾港区一期南区围(海)涂工程和乐清湾港区北区堤坝工程的围海造地施工,围海造地总面积达500余万平方米。围海造地首先要围堤施工,而围堤施工的重中之重是龙口施工与保护。龙口施工与保护的成败决定龙口能否按计划顺利合拢;关系到工程能否按时交工;关系到能否确保工程质量;关系到能否确保工程结构和人身安全;关系到能否避免(龙口被冲垮而造成的)重大经济损失。因此,在制订乐清湾港区北区堤坝工程施工时,对龙口施工与保护进行了认真
In order to develop the port business, in recent years, Yueqing Bay Port reclaimed land has been booming. So far, Yueqing Bay Port has completed the first phase of Wai Yue (Harbor) Tuen Mun project in Yueqing Bay Port Area and the Yueqing Bay Port Area North District dam engineering reclamation construction, reclamation of the total area of 5000000 square meters. The first reclamation should be constructed around the sea and the construction and protection of the Longkou should be the most important part of the embankment construction. Longkou construction and protection of the success or failure of the decision whether Longkou successfully closed according to plan; related to the project can be handed over on time; related to the project can ensure the quality; related to the project to ensure structural and personal safety; can be avoided (Longkou be Washed away caused by) a major economic loss. Therefore, during the construction of the levee construction in the northern part of Yueqing Bay Port Area, the construction and protection of Longkou have been conscientiously carried out