论文部分内容阅读
本文以辽河石佛寺水库枢纽一期工程泄洪闸基础防渗施工为研究实例,论述了基于第四系地层高压旋喷防渗墙 的施工工艺及检测手段和方法。
In this paper, the Liaohe Shifu Temple Reservoir Phase I Project Flood Control Sluice Foundation seepage control construction as an example, discussed based on the Quaternary stratigraphic high pressure jet grouting cutoff wall construction technology and testing methods and methods.