论文部分内容阅读
本文结合巫山县江东新城龙江大道施工过程中形成的不稳定高边坡,探讨植被混凝土坡面防护+清方卸载进行场平的可行性,并提出了区域标高考虑周围规划道路标高,以利于后期开发利用的实施方案。
Based on the unstable high slope formed during the construction of Longjiang Avenue in Jiangdong New City in Wushan County, this paper discusses the feasibility of using the slope protection and the unloading of vegetation concrete to carry out the field level. It also proposes that the elevation of the surrounding planning roads should be considered in the elevation of the area to facilitate Post-implementation of the implementation of the program.