论文部分内容阅读
针对地铁在“Y”形线路交汇点的运行冲突问题,具体结合杭州地铁1号线工程九堡东站实际配线,定义交汇点和交汇区域,介绍“Y”形线路交汇点运行冲突信号系统调整的几种方法,举例说明实际“Y”形线路一个分支列车晚点对另一个分支列车的影响。
In view of the operation conflict of the “Y” -shaped line junctions of the MTRC and the actual wiring of Jiubao East Station of Hangzhou Metro Line 1, the intersection and intersection area is defined and the intersection of “Y” shaped lines is introduced Several methods of running a conflict signal system adjust to illustrate the effect of a late ’s “actual” “Y” line on another branch train.