基于时序动态视角的配电网规划技术评价研究

来源 :科技和产业 | 被引量 : 0次 | 上传用户:Sqiwei
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对配电网规划技术评价问题,选取供电可靠率、综合线损率、单位投资增供负荷、容载比、满足N-1主变比例、联络率、线路电缆化率、架空线路绝缘化率8个指标,应用基于时序动态视角的评价方法,即“五步法”:指标筛选→指标类型一致化→指标无量纲化→“纵横向”拉开档次法→TOWGA算子评价法,以吉林省3个地级市的配电网作为算例进行分析。这种方法没有丝毫主观色彩,适用于配电网规划技术动态评价,能够为供电企业同业对标提供参考。 According to the technical problems of distribution network planning, this paper selects the reliability of power supply, the comprehensive loss rate, the unit investment to provide load, the capacity to load ratio to meet the N-1 main transformer ratio, contact rate, cable rate, overhead line insulation rate Eight indicators, the application of time-based dynamic perspective of the evaluation method, namely “five-step method ”: index screening> uniform type of indicators indicators dimensionless “vertical and horizontal ” opened the grade method TOWGA operator evaluation Method, with three prefecture-level cities in Jilin Province distribution network as an example for analysis. This method does not have the slightest subjective color, suitable for dynamic evaluation of distribution network planning technology, to provide reference for benchmarking peers in the power supply industry.
其他文献
根据中国海关统计,2010年1。6月,纺织机械进出口总额26.59亿美元,同比增长51%。其中,出口7.76亿美元,进口18.83亿美元,同比增长分别为38%和56%,两者增幅比上年同期分别提高了70%和106%。以上
本文通过的目前电脑横机中的选针器结构和原理的介绍,结合市场上的一款选针器的参数分析,讨论了选针器选型过程中的注意点。
2009年,国际金融危机下的外需不足将会给纺织行业出口造成更大压力,但纺织行业多年来依靠较强竞争优势形成的稳定市场份额使得行业在国际市场上具有一定的抗风险能力:尽管存
期刊
以财政补助对各省域的保障能力为切入点进行分析,认为中央财政的补助政策有助于实现区域之间的公平,但在同一区域内,地方财政的养老保障能力与中央财政的养老保障能力排序一致,地