论文部分内容阅读
《建筑法》通过并实施以来,引起了建筑业人士的广泛注意,掀起了学习《建筑法》的热潮。笔者也对《建筑法》作了研究,对“禁止建筑工程肢解发包”的条款有一些自己的看法,愿在此提出来与大家共同探讨。在《建筑法》第二十四条规定:禁止将建筑工程肢解发包。在本法中没有对肢解发包进行定义.只是在本条款中附带一句:“不得将应由一个承包单位完成的建筑工程肢解成若干部分发包给几个承包单位”。这名话的语义是非常模糊的。“一个承包单位完成的建筑工程”
Since the adoption and implementation of the Construction Law, widespread attention has been drawn from the construction industry and a boom in studying the “Building Law” has been set off. The author also made a study on the “Building Law” and gave his own views on the provisions of the “Prohibition of Construction Engineering Dismemberment”, and is ready to discuss it with you here. Article 24 of the Construction Law stipulates: It is forbidden to dismember a construction project. There is no definition of dismemberment in this Act, except that the following clause is added: “No dismantling of a construction work to be completed by one contractor into several parts to several contractors”. The semantic meaning of this name is very vague. “A contractor to complete the construction ”