【摘 要】
:
东风水电站是贵州乌江干流上的第二个梯级电站,地处岩溶地区,枢纽由拦河大坝、右岸地下厂房、泄洪系统和防渗帷幕四大部分组成,电站装机51万kW。拦河大坝最大坝高162m,厚高
论文部分内容阅读
东风水电站是贵州乌江干流上的第二个梯级电站,地处岩溶地区,枢纽由拦河大坝、右岸地下厂房、泄洪系统和防渗帷幕四大部分组成,电站装机51万kW。拦河大坝最大坝高162m,厚高比仅0.163,是目前国内高于150m的拱坝中最薄的双曲拱坝。防渗帷幕总面积为55万m~2,帷幕灌浆孔总量达32.15万m。贵阳
Dongfeng Hydropower Station is the second cascade power station on the Wujiang River in Guizhou. It is located in the karst area. The hub is composed of the dam, the underground powerhouse on the right bank, the flood discharge system and the anti-seepage curtain. The installed capacity of the power station is 510,000 kW. Dam maximum dam height of 162m, thickness of only 0.163, is currently the arch dam in more than 150m of the thinnest of the double-curvature arch dam. The total area of anti-seepage curtains is 550,000 m 2, and the total amount of curtain grouting holes reaches 321,500 m. Guiyang
其他文献
文内列述了在用不同方法配制煤矿防尘用固体发泡剂基水溶液时的研究成果。研究了圆柱形和颗粒状固体发泡剂的可溶性。确定出最优的发泡剂商品形状和溶解方法,以保证工作液有
Band structures in wurtzite bulk ZnO/Zn1-xMgxO are calculated using first-principles based on the framework of generalized gradient approximation to density fun
一、前言在总结北龙凤井田水力压裂预排煤层瓦斯试验的基础上,于老虎台矿井田的西部,打了一个地面钻孔,预排煤层瓦斯。该孔深为821m,终孔于-730m 水平,煤层厚度为37m。孔位
辽宁省的有色金属矿山,大部分是开采多年的老矿,选矿处理的矿石品位逐渐贫化,矿石嵌布粒度较细,共生关系复杂,采用原设计的选矿工艺流程和选别条件越来越难以提高生产指标
徐州矿务局夹河煤矿7417回采工作面矿山压力监测研究课题,于去年12月中旬通过省级鉴定。该课题的研究运用了板的理论,首次提出有断层切割的顶板来压步距计算公式,计算结果得
“品牌”一词运用于电视媒体,是社会主义市场经济逐步完善和电视事业迅速发展,电视市场全方位竞争的产物。从本质上说,电视媒体的竞争,就是品牌的竞争。荧屏的繁荣,使观众的选择更
我们通过对福建省4个矿区12个矿井的瓦斯地质资料进行实测和收集,并对所获得的12000多个实测数据和瓦斯地质资料进行分析,已初步掌握了本省煤田瓦斯含量分布规律和矿井瓦斯
我国从七十年代初开始研制综采液压支架,至今已有十几年的历史。由于科研、制造和使用单位的通力合作,在破碎中硬顶板缓倾斜中厚煤层条件下使用的液压支架,巳基本形成系列。
谭泽薇,美国密西根大学大众传播新闻学博士,16年浸染于美国、亚洲媒体传播领域的经历使媒体事业成为她心中的至爱。从北京到上海,我们两度谋面,采访就像朋友之间的倾谈,从对
应用 CERES-小麦模型和 CERES-玉米模型分别进行了银川平原灌区春小麦与春玉米栽培方案优化模拟试验 ,依据模拟产量结果优化选择出春小麦和春玉米最优播期、施氮量和灌水量等