论文部分内容阅读
建筑物下倾斜条带开采,通过加强生产管理、组织好工作面搬家倒面衔接准备工作,和同条件下的全采相比,同样能取得较高的单产和效率.
Tilting strip mining under the building, through the strengthening of production management, organize the face to face convergence preparations, and under the same conditions with the whole mining, the same can achieve higher yield and efficiency.