摘要:近些年来,由于建筑行业的加速发展,对于建筑工程造价的预结算和审核工作也渐渐的受到建筑施工单位的重视。造价预结算的主要目的是合理确定和有效控制成本,规范预结算行为,更重要的原因还是实现资源优化配置,使投资效益最大化。合理地确定建筑工程造价。达到有效地控制建筑工程造价的目的,积极运用计算机系统辅助建筑工程造价的预结算审核和努力提高建筑工程造价预结算审核人员的素质。
关键词:建筑工程;造价预结算;审核方法
Abstract: in recent years, due to the accelerated development of construction industry, for the construction of engineering cost the settlement and audit work is getting the attention of the construction units. The main purpose of the settlement construction cost is reasonable and effective cost control, regulate the settlement behavior, more important reason or realize resource allocation optimization, make investment benefit maximization. To determine reasonable construction project cost. To effectively control building engineering cost objective, and actively use computer system construction project cost or assist the examining and efforts to improve the construction project cost the settlement of the personnel quality.
Keywords: building engineering; Cost the settlement; Audit methods
中图分类号:K826.16文献标识码:A 文章编号:
工程预结算是基本建设工作的重要组成部分,既是确定工程造价、反映工料机消耗水平和考核施工图是否经济合理、办理拨款结算的重要依据,也是签订施工、材料订购合同的重要内容,因此做好这项工作是非常重要的。
一、工程造价中预结算审核的方法
由于建设工程的生产过程是一个周期长、数量大的生产消费过程,具有多次性计价的特
点。因此采用合理的审核方法不仅能达到事半功倍的效果,而且将直接关系到审查的质量和
速度。主要审核方法如下:
1.1全面审核法
全面审核法就是按照施工图的要求,结合现行定额、施工组织设计、承包合同或协议以及有关造价计算的规定和文件等,全面地审核工程数量、定额单价以及费用计算。这种方法实际上与编制施工图预算的方法和过程基本相同。这种方法常常适用于初学者审核的施工图预算;投资不多的项目。这种方法的优点是:全面和细致,审查质量高,效果好。缺点是:工作量大,时间较长,存在重复劳动。
1.2重点审核法
重点审核法就是抓工程预结算中的重点进行审核的方法。这种方法类同于全面审核法,与全面审核法之区别仅是审核范围不同。该方法是有侧重的,一般选择工程量大而且费用比较高的分项工程的工程量作为审核重点。如基础工程、砖石工程、混凝土及钢筋混凝土工程,门窗幕墙工程等。高层结构还应注意内外装饰工程的工程量审核。而一些附属项目、零星项目(雨蓬、散水、坡道、明沟、水池、垃圾箱)等,往往忽略不计。
1.3对比审核法
在同一地区,如果单位工程的用途、结构和建筑标准都一样,其工程造价应该基本相似。因此在总结分析预结算资料的基础上,找出同类工程造价及工料消耗的规律性,整理出用途不同、结构形式不同、地区不同的工程的单方造价指标、工料消耗指标。然后,根据这些指标对审核对象进行分析对比,从中找出不符合投资规律的分部分项工程,针对这些子目进行重点计算,找出其差异较大的原因的审核方法。
1.4分组计算审查法
把预结算中有关项目划分若干组,利用同组中一个数据审查分项工程量的一种方法。采
用这种方法,首先把若干分部分项工程,按相邻且有一定内在联系的项目进行编组。利用同组中分项工程间具有相同或相近计算基数的关系,审查一个分项工程数量,就能判断同组中其他几个分项工程量的准确程度。如把底层建筑面积、底层地面面积、地面垫层、地面面层、楼面面积、楼面找平层、楼板体积、天棚抹灰、天棚涂料面层等编为一组,先把底层建筑面积、楼地面面积求出来,其他分项的工程量利用这些基数就能得出。这种方法的最大优点是审查速度快,工作量小。
二、预结算审核的基本步骤
2.1做好预结算的准备工作,熟悉建筑工程施工图纸
图纸是编审预结算分项数量的重要依据,必须全面熟悉了解,核对所有图纸,清点无误后依次识读,了解预期结算的内容包括土建、安装、设计变更及建筑工程鉴证等。
2.2选择合适的审查方法,按相应内容审查。
由于建筑工程建设规模与繁简不同,施工方法和施工企业情况不一。所编制建筑工程预结算繁简和质量也不同,因此需选择适当的审查方法进行审查。对换算的定额单价的审核,除按上述要求外,还要弄清允许换算的内容是定额中的人工、材料或机械中的哪部分?换算的方法是否准确?采用的系数是否正确?这些都将直接影响单价的准确性。对补充定额的审核,主要是检查编制的依据和方法是否正确,材料预算价格、人工工日及机械台班单价是否合理。
2.3综合整理审查资料并与编制单位交换意见
根据建筑工程情况、施工情况进行认真的分析讨论,实事求是地处理。
三、提高建筑工程造价预结算审核质量的方法
3.1做好对工程量的审核
建筑安装工程造价是随着工程量的增加而增加,根据设计图纸、定额及工程量计算规则,
专业设备材料表,建构筑物和总图运输一览表,对已算出的工程量计算表进行审查,主要是审查工程量是否有漏算、重算和错算,审查要抓住重点详细计算和核对,其它分项工程可作一般性审查,审查时要注意计算工程量的尺寸数据来源和计算方法。
3.2熟悉精通工程量计算规则
工程预决算的质量取决于工程量的准确度。只有熟悉精通定额工程量的计算规则,才能
准确无误地计算工程量。施工单位编制的决算。往往在隐蔽交叉部位多算工程量,例如在土建工程结构图中,梁与柱交接时,梁算至柱的侧面,主梁与次梁交接时,次梁算至主梁的侧面。但多数施工企业的预算员都是按照梁柱的结构尺寸统算,交接重复部分没有扣减,加大了工程量,提高了工程造价,若建设单位的预算审核人员,不熟悉计算规则,就难以去伪存真核实工程量。
3.3要熟悉预算定额分部分项工程内容。
在建筑工程预算定额子目中,首先要熟悉每个定额项目包括的工作内容,特别是对一些综合定额项目,更应该注意定额综合的内容,如果对一些综合的内容都不熟悉,就会造成重复立项,重复套用定额子目的错误,促使工程造价提高。
3.4对定额子目的审核。
对于一个工程项目应该套用哪一个分部、子目,差异很大,特别是对一些模棱两可的项目,例如土石方类别更为明显。所以我们在审核决算中,要熟悉定额中同类工程量的子目套用界限,实事求是加以核定。
3.5对材料价格的核实。
随着国家经济体制改革的深人发展,市场价格体制有了很大的变化,材料价格上下浮动较大。当前不论何种承包方式,仍有一些材料或设备为建设单位采购供货,若委托施工单位代办,所发生的价差由建设单位负担,因此,对材料价格的核定不容忽視,引起建设单位预算审核人员的高度重视。目前社会上对票据管理比较混乱,实价虚报经常发生,对此,审核人员必须深人实际,进行市场调查,合理确定价格。
3.6对工程签证的审核。
工程经济签证方面,有些建设单位的甲方代表对工程经济技术定额不熟悉,属于预算定额范围内的工程内容,又另办了经济签证,甚至越权乱办签证,如夜间施工增加费,按费用定额规定,夜间连续施工必须超过零点才谁许计算等,这些问题在审价中应给予关注。
3.7对费用的审核。
工程费用包括的内容各地不一,具体计算时应按当地的现行规定执行,主要注意审查费用定额是否区分工程性质土建、装饰、安装、修缮等,再重点审查所使用费率与工程类别、造价部门有关文件、招标文件、施工合同等是否相符。最后审查计费基数和工程造价计算程序是否正确。
3.8对项目各项乘积、小计、合计进行审核。
审价机构只有不断地加强自身建设,以合同为基础、政策为指导、标准为依据,不偏不倚地进行工作,才能正确发挥咨询业在工程造价中的作用。
总之,工程预结算是实施控制建设工程造价的重要环节,它直接关系到基本建设投资经济效益。因此,工程预结算的审核人员,应不断提高业务素质和思想素质,不断总结经验,严把工程预结算的审核关,只有这样,工程造价才能得到合理地确定与有效的控制,从而提高工程投资的使用效益。
参考文献:
[1]莫龙展.建筑工程造价预结算审核管理策略浅探[J].现代装饰(理论),2012,(1).
[2]张玲.建筑工程造价预结算审核工作要点研究[J].价值工程,2011,(32).
关键词:建筑工程;造价预结算;审核方法
Abstract: in recent years, due to the accelerated development of construction industry, for the construction of engineering cost the settlement and audit work is getting the attention of the construction units. The main purpose of the settlement construction cost is reasonable and effective cost control, regulate the settlement behavior, more important reason or realize resource allocation optimization, make investment benefit maximization. To determine reasonable construction project cost. To effectively control building engineering cost objective, and actively use computer system construction project cost or assist the examining and efforts to improve the construction project cost the settlement of the personnel quality.
Keywords: building engineering; Cost the settlement; Audit methods
中图分类号:K826.16文献标识码:A 文章编号:
工程预结算是基本建设工作的重要组成部分,既是确定工程造价、反映工料机消耗水平和考核施工图是否经济合理、办理拨款结算的重要依据,也是签订施工、材料订购合同的重要内容,因此做好这项工作是非常重要的。
一、工程造价中预结算审核的方法
由于建设工程的生产过程是一个周期长、数量大的生产消费过程,具有多次性计价的特
点。因此采用合理的审核方法不仅能达到事半功倍的效果,而且将直接关系到审查的质量和
速度。主要审核方法如下:
1.1全面审核法
全面审核法就是按照施工图的要求,结合现行定额、施工组织设计、承包合同或协议以及有关造价计算的规定和文件等,全面地审核工程数量、定额单价以及费用计算。这种方法实际上与编制施工图预算的方法和过程基本相同。这种方法常常适用于初学者审核的施工图预算;投资不多的项目。这种方法的优点是:全面和细致,审查质量高,效果好。缺点是:工作量大,时间较长,存在重复劳动。
1.2重点审核法
重点审核法就是抓工程预结算中的重点进行审核的方法。这种方法类同于全面审核法,与全面审核法之区别仅是审核范围不同。该方法是有侧重的,一般选择工程量大而且费用比较高的分项工程的工程量作为审核重点。如基础工程、砖石工程、混凝土及钢筋混凝土工程,门窗幕墙工程等。高层结构还应注意内外装饰工程的工程量审核。而一些附属项目、零星项目(雨蓬、散水、坡道、明沟、水池、垃圾箱)等,往往忽略不计。
1.3对比审核法
在同一地区,如果单位工程的用途、结构和建筑标准都一样,其工程造价应该基本相似。因此在总结分析预结算资料的基础上,找出同类工程造价及工料消耗的规律性,整理出用途不同、结构形式不同、地区不同的工程的单方造价指标、工料消耗指标。然后,根据这些指标对审核对象进行分析对比,从中找出不符合投资规律的分部分项工程,针对这些子目进行重点计算,找出其差异较大的原因的审核方法。
1.4分组计算审查法
把预结算中有关项目划分若干组,利用同组中一个数据审查分项工程量的一种方法。采
用这种方法,首先把若干分部分项工程,按相邻且有一定内在联系的项目进行编组。利用同组中分项工程间具有相同或相近计算基数的关系,审查一个分项工程数量,就能判断同组中其他几个分项工程量的准确程度。如把底层建筑面积、底层地面面积、地面垫层、地面面层、楼面面积、楼面找平层、楼板体积、天棚抹灰、天棚涂料面层等编为一组,先把底层建筑面积、楼地面面积求出来,其他分项的工程量利用这些基数就能得出。这种方法的最大优点是审查速度快,工作量小。
二、预结算审核的基本步骤
2.1做好预结算的准备工作,熟悉建筑工程施工图纸
图纸是编审预结算分项数量的重要依据,必须全面熟悉了解,核对所有图纸,清点无误后依次识读,了解预期结算的内容包括土建、安装、设计变更及建筑工程鉴证等。
2.2选择合适的审查方法,按相应内容审查。
由于建筑工程建设规模与繁简不同,施工方法和施工企业情况不一。所编制建筑工程预结算繁简和质量也不同,因此需选择适当的审查方法进行审查。对换算的定额单价的审核,除按上述要求外,还要弄清允许换算的内容是定额中的人工、材料或机械中的哪部分?换算的方法是否准确?采用的系数是否正确?这些都将直接影响单价的准确性。对补充定额的审核,主要是检查编制的依据和方法是否正确,材料预算价格、人工工日及机械台班单价是否合理。
2.3综合整理审查资料并与编制单位交换意见
根据建筑工程情况、施工情况进行认真的分析讨论,实事求是地处理。
三、提高建筑工程造价预结算审核质量的方法
3.1做好对工程量的审核
建筑安装工程造价是随着工程量的增加而增加,根据设计图纸、定额及工程量计算规则,
专业设备材料表,建构筑物和总图运输一览表,对已算出的工程量计算表进行审查,主要是审查工程量是否有漏算、重算和错算,审查要抓住重点详细计算和核对,其它分项工程可作一般性审查,审查时要注意计算工程量的尺寸数据来源和计算方法。
3.2熟悉精通工程量计算规则
工程预决算的质量取决于工程量的准确度。只有熟悉精通定额工程量的计算规则,才能
准确无误地计算工程量。施工单位编制的决算。往往在隐蔽交叉部位多算工程量,例如在土建工程结构图中,梁与柱交接时,梁算至柱的侧面,主梁与次梁交接时,次梁算至主梁的侧面。但多数施工企业的预算员都是按照梁柱的结构尺寸统算,交接重复部分没有扣减,加大了工程量,提高了工程造价,若建设单位的预算审核人员,不熟悉计算规则,就难以去伪存真核实工程量。
3.3要熟悉预算定额分部分项工程内容。
在建筑工程预算定额子目中,首先要熟悉每个定额项目包括的工作内容,特别是对一些综合定额项目,更应该注意定额综合的内容,如果对一些综合的内容都不熟悉,就会造成重复立项,重复套用定额子目的错误,促使工程造价提高。
3.4对定额子目的审核。
对于一个工程项目应该套用哪一个分部、子目,差异很大,特别是对一些模棱两可的项目,例如土石方类别更为明显。所以我们在审核决算中,要熟悉定额中同类工程量的子目套用界限,实事求是加以核定。
3.5对材料价格的核实。
随着国家经济体制改革的深人发展,市场价格体制有了很大的变化,材料价格上下浮动较大。当前不论何种承包方式,仍有一些材料或设备为建设单位采购供货,若委托施工单位代办,所发生的价差由建设单位负担,因此,对材料价格的核定不容忽視,引起建设单位预算审核人员的高度重视。目前社会上对票据管理比较混乱,实价虚报经常发生,对此,审核人员必须深人实际,进行市场调查,合理确定价格。
3.6对工程签证的审核。
工程经济签证方面,有些建设单位的甲方代表对工程经济技术定额不熟悉,属于预算定额范围内的工程内容,又另办了经济签证,甚至越权乱办签证,如夜间施工增加费,按费用定额规定,夜间连续施工必须超过零点才谁许计算等,这些问题在审价中应给予关注。
3.7对费用的审核。
工程费用包括的内容各地不一,具体计算时应按当地的现行规定执行,主要注意审查费用定额是否区分工程性质土建、装饰、安装、修缮等,再重点审查所使用费率与工程类别、造价部门有关文件、招标文件、施工合同等是否相符。最后审查计费基数和工程造价计算程序是否正确。
3.8对项目各项乘积、小计、合计进行审核。
审价机构只有不断地加强自身建设,以合同为基础、政策为指导、标准为依据,不偏不倚地进行工作,才能正确发挥咨询业在工程造价中的作用。
总之,工程预结算是实施控制建设工程造价的重要环节,它直接关系到基本建设投资经济效益。因此,工程预结算的审核人员,应不断提高业务素质和思想素质,不断总结经验,严把工程预结算的审核关,只有这样,工程造价才能得到合理地确定与有效的控制,从而提高工程投资的使用效益。