论文部分内容阅读
部署于塔河油田东南部KZ5井区的开发准备井——K25井,日前对白垩系亚格列木组顶部3798~3800m井段进行完井射孔测试,喜获工业油气流,日产液19.6m3,日产气921~927m3,含水为零。
K25 wells deployed in the KZ5 well block in the southeastern part of the Tahe Oilfield have completed perforation tests on well 3798 to 3800 m at the top of the Cretaceous Yagelimu Formation and received industrial oil and gas streams 19.6 m3, Nissan 921 ~ 927m3 gas, water is zero.