论文部分内容阅读
本项目水资源论证的主要任务是根据论证区水平年的用水要求,在区域水资源现状和开发利用情况分析的基础上,对建设项目取用水的合理性,取水水源的可靠性以及取水,退水对区域水资源状况和其他用户的影响等方面进行分析论证,提出建设项目合理的取水方案和退水方案建议,以便达到合理开发,节约使用,有效保护水资源的目的,并为业主单位向水行政主管部门提出取水申请提供依据。
The main task of water resources demonstration of this project is based on the water requirement of the year of demonstration area, on the basis of the analysis of the current situation of water resources in the area and the development and utilization of the project, the rationality of water intake of construction projects, reliability of water intake, Water on the status of regional water resources and other users to analyze and demonstrate the feasibility of the proposed construction project water withdrawal program and the proposal of the program in order to achieve the rational development, conservation, and effective protection of water resources, and for the owners to the unit The water administrative department shall provide the basis for water withdrawal application.