最近,在宝钢基建施工中发生了两起性质相同的重复工伤事故。两起事故都发生在上、下工序交接过程中间。根据交工要求,土建完工后,在清除建筑垃圾时同时要清除设备孔口的临时安全设施,但没有规定在此同时必须采取新的安全设施,因而造成孔口畅开,在无安全设施的状态下,发生了工人从孔口坠落的事故。这类事故早在一期工程建设中就屡有发生,但长期没有引起施工单位的领导和有关部门应有的重视,没有采取
Recently, two similar accidents involving repeated work accidents occurred in Baosteel’s infrastructure construction. Both accidents occurred in the middle of the process of handover. According to the request for handing over work, after the civil construction is completed, the temporary safety facilities of the equipment orifices should be cleared at the same time when removing the construction wastes. However, it is not stipulated that new safety measures must be taken at the same time. As a result, the openings are opened without safety facilities Under the workers accidental crashes from the orifice. Such incidents occurred frequently in the construction of the first phase project, but the construction unit’s leadership and relevant departments should not pay due attention and did not take