论文部分内容阅读
介绍了泰安一级抽水蓄能电站下水库(大河水库)拦河坝采用高压旋喷板墙处理坝基、坝肩渗漏和上、下游护坡加固措施及溢洪道改建工程、金属结构设计等方面的设计经验。
This paper introduces the design experience of using the high pressure rotary jet grouting wall to treat the dam foundation, the seepage of the abutment, the reinforcement measures of the upper and lower reaches, the reconstruction of the spillway and the structural design of the metal for the dam of Taian First Pumped Storage Power Station (Dahe Reservoir).