摘要:随着我国市场经济体制的不断完善,公路作为国民经济发展的重要基础设施正日益发挥着极其重要的作用。因此,如何根据公路施工的特点,加强施工现场管理、将施工各要素进行科学、合理地安排,在一定的时间和空间内有组织、有计划、有秩序地开展施工,实现工程项目快速、优质、低耗,已成为公路建设者普遍关注的焦点。本文对高速公路施工项目的优化管理进行科学有益的探索。
关键词:高速公路施工;施工管理;施工问题;管理策略
On the highway construction project management and coping strategies
Zheng Ruijie
Abstract: As China's market economic system, continuous improvement, economic development as an important road infrastructure is increasingly playing an extremely important role. Therefore, how the characteristics of highway construction, strengthen the construction site management will be the construction of the elements of a scientific and reasonable arrangement, in a certain period of time and space organized, planned, orderly manner to carry out construction projects to achieve rapid, high-quality , low energy consumption, road builders has become the focus of widespread concern. In this paper, the optimization of the highway construction project management useful for scientific exploration.
Keywords: highway construction;Construction management;Construction issues;Management strategy
一、高速公路工程施工管理的含义
高速公路工程施工管理的含义有狭义和广义两种。广义的施工管理是指工程从施工准备、建筑安装到交工验收的全部施工过程的全面管理,其中包括计划管理、技术管理、质量管理等等。狭义的施工管理是指施工过程中生产作业方面的管理。本文只从狭义的角度谈施工管理。
二、高速公路施工管理过程中存在的问题
1、变更大,浪费多。由于地质条件、自然环境的变化,导致一些设计阶段的计划无法执行,实际施工过程中被迫修改,造成很多不必要的开支。以姜眉公路宝鸡段为例,该工程的施工地段在秦岭深山的古褒斜道上,地质结构复杂,路线沿红岩河、龟川河逆流而上,穿山跨河, ,桥、涵、隧工程项目多,雨水的冲刷使姜眉公路宝鸡段原工程设计在很多地方存在不完善或不尽合理之处,随着工程建设的逐步深入,只有变更原设计才能符合技术标准和质量要求。
2、工期短,难度大。现阶段我国高速公路建设任务繁多,对建设的速度要求过快,往往是在紧张的施工建设中,就有很多高速公路在等待开工。然而,我国高速公路工程施工测绘管理方式还属于粗放式管理模式,这种管理模式难以精确控制土石方费用,耽搁工程进度,测量工程事故也时有发生。
3、监督管理不严。有些公路监理责任心不强,承包人没有预先提出质检申请,监理却做了质检工作,出现先检验而后有检验申请报告的现象,违反了施工监理的正常程序。施工过程中,还存在不按规定频率检验的情况。如在路堤的填筑过程中,必须严格控制填筑分层厚度和压实度,要求每填筑完一层,承包人必须自检,监理要抽检,压实度合格后才能填筑上一层。但在实际施工过程中,有的承包人只强调施工进度,未按规定频率进行自检,监理也不按规定频率进行抽检,这显然有悖于施工监理程序。企业自检、监理抽检是工程质量保证的关键性环节。二者缺一不可。
三、加强高速公路施工管理的策略
1、做好质量管理的前期准备工作
1认真学习合同文件、技术规范,落实岗位职责。进入工地现场后,做好对全员进行质量意识培训的准备,需认真组织参加施工的全体人员学习合同文件、技术规范,依据有关文件精神,结合本工程的实际,制定全体施工人员的质量责任明确岗位职责,并制定详细的质量管理工作计划,强化施工队伍的质量意识教育,加强施工队伍的岗前培训,层层分解质量目标,使质量目标落实到最基层的施工人员身上,落实到各个单项工程及各道工序上,确保质量控制落到实处,确保质量管理工作的顺利进行。
2各个单项工程开工前,要对参加施工的全体人员进行工程施工应知应会教育。加强施工人员对规范、标准的学习,并加强技术培训,使其能熟练地掌握施工技术和基本方法,并严格考核,做到工程施工严格按设计与“技术规范”操作。通过教育与考核,实行全体施工人员持证上岗、挂牌作业。
3各个单项工程开工前,要组织人员对原材料、机械设备、施工工艺、检测方法和可能遇到的质量问题及预防措施进行充分的施工前准备,并认真进行检查,确定完善后,再进行施工。施工前准备工作必须细致,不能疏漏。由于施工建设是异常复杂多变的,准备工作也需要随工程进度而不断调整、不断改进、不断完善,准备工作应贯穿于整个施工过程的始终。
2、落实高速公路质量管理责任制。为了加强质量管理,施工企业中标后,要实行分级管理、层层负责。建立项目经理部、工程施工处、专业工程施工队三级质量管理体系。成立工地試验室、质量自检组、资料整理组,各尽所能,各司其职。项目经理作为质量第一责任人,质检负责人全面负责质量管理工作。工程施工处以各处处长为质量第一责任人,质量自检员负责该处的质量自检工作。施工队以各队队长为质量第一责任人,由质量自检员负责该队的质量自检工作。制定各自的岗位职责,做到质量责任,层层落实。
3、严格执行质量控制程序
工序质量是施工质量的基础,工序质量也是施工顺利进行的关键。为达到对工序质量控制的效果,在工序管理方面应做到:
1制定严格的质量控制程序。根据工程的合同要求,在工程施工中,制定严格的质量控制程序。开工前,编制上报“开工报告”;施工中,首先施工企业自检,自检合格后,报请监理工程师抽检,抽检合格方可继续施工。
2做好施工技术交底工作。项目经理部编制《施工组织设计》,编制详细的施工工艺方案,明确质量目标。通过认真细致的技术交底工作,使参加施工的全体人员明确设计意图,明确工程施工技术标准及操作细则,明确工程的质量目标,使各项工程质量目标及质量控制落实到最基层的全体施工人员身上。
3认真做好试验路段的施工。遵照“公路工程施工技术规范”的要求,认真做好试验路段的施工,确定各项工程的施工技术方案及质量控制措施,指导全线工程的施工。
4、加强施工现场的质量控制
加强对原材料的质量控制,认真做好工地试验工作。项目经理部要成立工地试验室,并配备业务精通、工作认真负责的专职试验人员,认真开展工地试验工作,为工程质量控制提供可靠的依据。在工程开工之前,项目经理部要组织技术人员对导线点、中桩和高程进行反复测量,使之达到闭合要求。保证中线和高程误差在规定允许的范围之内。在施工过程中,要重点对公路路基中线及各个桥涵构造物的平面位置、高程、预制构件的几何尺寸等进行严格控制,使各项测量成果均控制在规范允许的范围之内。
四、结束语
管理作为一种力量,一种财富,它在提升项目管理整体质量水平的过程中,正在发挥着极大的作用。实现高速公路新的跨越式发展,不仅仅局限在数量的简单增加,作为项目直接管理者,我们要思考的是在内涵上、质量上的新突破。
参考文献
1、黎柏青.公路工程施工过程中有效控制成本的方法[J].吉林交通科技,2006.
2、李春森.公路工程项目施工全过程成本控制[J].交通企业管理,2008,(01).
3、赵忠.公路工程项目成本管理的研究[J].山西建筑,2007,(36).
作者简介:郑锐杰(1974.10—) 男 工程师 本科 项目总工程师
关键词:高速公路施工;施工管理;施工问题;管理策略
On the highway construction project management and coping strategies
Zheng Ruijie
Abstract: As China's market economic system, continuous improvement, economic development as an important road infrastructure is increasingly playing an extremely important role. Therefore, how the characteristics of highway construction, strengthen the construction site management will be the construction of the elements of a scientific and reasonable arrangement, in a certain period of time and space organized, planned, orderly manner to carry out construction projects to achieve rapid, high-quality , low energy consumption, road builders has become the focus of widespread concern. In this paper, the optimization of the highway construction project management useful for scientific exploration.
Keywords: highway construction;Construction management;Construction issues;Management strategy
一、高速公路工程施工管理的含义
高速公路工程施工管理的含义有狭义和广义两种。广义的施工管理是指工程从施工准备、建筑安装到交工验收的全部施工过程的全面管理,其中包括计划管理、技术管理、质量管理等等。狭义的施工管理是指施工过程中生产作业方面的管理。本文只从狭义的角度谈施工管理。
二、高速公路施工管理过程中存在的问题
1、变更大,浪费多。由于地质条件、自然环境的变化,导致一些设计阶段的计划无法执行,实际施工过程中被迫修改,造成很多不必要的开支。以姜眉公路宝鸡段为例,该工程的施工地段在秦岭深山的古褒斜道上,地质结构复杂,路线沿红岩河、龟川河逆流而上,穿山跨河, ,桥、涵、隧工程项目多,雨水的冲刷使姜眉公路宝鸡段原工程设计在很多地方存在不完善或不尽合理之处,随着工程建设的逐步深入,只有变更原设计才能符合技术标准和质量要求。
2、工期短,难度大。现阶段我国高速公路建设任务繁多,对建设的速度要求过快,往往是在紧张的施工建设中,就有很多高速公路在等待开工。然而,我国高速公路工程施工测绘管理方式还属于粗放式管理模式,这种管理模式难以精确控制土石方费用,耽搁工程进度,测量工程事故也时有发生。
3、监督管理不严。有些公路监理责任心不强,承包人没有预先提出质检申请,监理却做了质检工作,出现先检验而后有检验申请报告的现象,违反了施工监理的正常程序。施工过程中,还存在不按规定频率检验的情况。如在路堤的填筑过程中,必须严格控制填筑分层厚度和压实度,要求每填筑完一层,承包人必须自检,监理要抽检,压实度合格后才能填筑上一层。但在实际施工过程中,有的承包人只强调施工进度,未按规定频率进行自检,监理也不按规定频率进行抽检,这显然有悖于施工监理程序。企业自检、监理抽检是工程质量保证的关键性环节。二者缺一不可。
三、加强高速公路施工管理的策略
1、做好质量管理的前期准备工作
1认真学习合同文件、技术规范,落实岗位职责。进入工地现场后,做好对全员进行质量意识培训的准备,需认真组织参加施工的全体人员学习合同文件、技术规范,依据有关文件精神,结合本工程的实际,制定全体施工人员的质量责任明确岗位职责,并制定详细的质量管理工作计划,强化施工队伍的质量意识教育,加强施工队伍的岗前培训,层层分解质量目标,使质量目标落实到最基层的施工人员身上,落实到各个单项工程及各道工序上,确保质量控制落到实处,确保质量管理工作的顺利进行。
2各个单项工程开工前,要对参加施工的全体人员进行工程施工应知应会教育。加强施工人员对规范、标准的学习,并加强技术培训,使其能熟练地掌握施工技术和基本方法,并严格考核,做到工程施工严格按设计与“技术规范”操作。通过教育与考核,实行全体施工人员持证上岗、挂牌作业。
3各个单项工程开工前,要组织人员对原材料、机械设备、施工工艺、检测方法和可能遇到的质量问题及预防措施进行充分的施工前准备,并认真进行检查,确定完善后,再进行施工。施工前准备工作必须细致,不能疏漏。由于施工建设是异常复杂多变的,准备工作也需要随工程进度而不断调整、不断改进、不断完善,准备工作应贯穿于整个施工过程的始终。
2、落实高速公路质量管理责任制。为了加强质量管理,施工企业中标后,要实行分级管理、层层负责。建立项目经理部、工程施工处、专业工程施工队三级质量管理体系。成立工地試验室、质量自检组、资料整理组,各尽所能,各司其职。项目经理作为质量第一责任人,质检负责人全面负责质量管理工作。工程施工处以各处处长为质量第一责任人,质量自检员负责该处的质量自检工作。施工队以各队队长为质量第一责任人,由质量自检员负责该队的质量自检工作。制定各自的岗位职责,做到质量责任,层层落实。
3、严格执行质量控制程序
工序质量是施工质量的基础,工序质量也是施工顺利进行的关键。为达到对工序质量控制的效果,在工序管理方面应做到:
1制定严格的质量控制程序。根据工程的合同要求,在工程施工中,制定严格的质量控制程序。开工前,编制上报“开工报告”;施工中,首先施工企业自检,自检合格后,报请监理工程师抽检,抽检合格方可继续施工。
2做好施工技术交底工作。项目经理部编制《施工组织设计》,编制详细的施工工艺方案,明确质量目标。通过认真细致的技术交底工作,使参加施工的全体人员明确设计意图,明确工程施工技术标准及操作细则,明确工程的质量目标,使各项工程质量目标及质量控制落实到最基层的全体施工人员身上。
3认真做好试验路段的施工。遵照“公路工程施工技术规范”的要求,认真做好试验路段的施工,确定各项工程的施工技术方案及质量控制措施,指导全线工程的施工。
4、加强施工现场的质量控制
加强对原材料的质量控制,认真做好工地试验工作。项目经理部要成立工地试验室,并配备业务精通、工作认真负责的专职试验人员,认真开展工地试验工作,为工程质量控制提供可靠的依据。在工程开工之前,项目经理部要组织技术人员对导线点、中桩和高程进行反复测量,使之达到闭合要求。保证中线和高程误差在规定允许的范围之内。在施工过程中,要重点对公路路基中线及各个桥涵构造物的平面位置、高程、预制构件的几何尺寸等进行严格控制,使各项测量成果均控制在规范允许的范围之内。
四、结束语
管理作为一种力量,一种财富,它在提升项目管理整体质量水平的过程中,正在发挥着极大的作用。实现高速公路新的跨越式发展,不仅仅局限在数量的简单增加,作为项目直接管理者,我们要思考的是在内涵上、质量上的新突破。